Loading...
20150527113153874.pdfResponse to City of Edmonds Building Division ;�r9�,, ot,. Plan Review Corrections (May 18, 2015)'"' Robert Gould Law Firm May 21, 2015 Plan Check: BLD2015-0538 1. clarify the difference in the work proposed on the exterior of the building and plumbing and of that noted on the permit application. The scope of work must be consistently represented on the construction documents to guide proper review, installation, and inspection. Tully & Assoc.: 1. The notes on the site plan are incorrect. This project does not include exterior and plumbing work. The site plan notes have been removed and clouded with Rev.1 noted. 2. Contruction Plan — Change on the plans the sheet number of the elevation detail reference 'A' in space '206' — Private Office —from 'D-2' to 'D-1'. 3. Wall Schedule & Symbols — New Building Standard Sound Partition — Change on the plans the sheet number of the referenced details from 'D-2' to 'D-1'. 4. Door Schedule — Type B — Change on the plans the sheet number of the referenced details from 'D-2' to 'D-1'. 5. Hardware Groups — Type B a. Change on the plans the sheet number of the referenced details from 'D-2' to 'D-1'. b. Indicate on the plans the requirement that when in the fully open position, operating hardware on sliding doors shall be exposed and usable from both sides per International Code Council (ICC) A117.1-2009 section 404.2.6. Such hardware shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. 6. Lighting calculations — Update on the plans the provided information using the 2012 Washington State Energy Code (WSEC) compliance forms for Commercial Buildings — Interior Lighting summary. Tully & Assoc.: 2. Construction Plan — The sheet number of the elevation detail reference A in Rm. 206 has been changed to D-1 and clouded with Rev.1 noted. 3. Wall Schedule & Symbols —New Building Standard sound Partition —The sheet number of the referenced details has been changed to D-1 and clouded with Rev. 1 noted. 4. Door Schedule — The sheet number of the referenced details for Type B has been changed to D-1 and clouded with Rev.1 noted. Hardware Groups — Type B a. The plan sheet number of the referenced details has been changed to D-1 and clouded with Rev.1 noted. b. Pocket door: 02/B/b has been revised on the plan and door schedule so that the operating hardware is exposed and usable from both sides. The referenced detail 6/D-1 has also been revised and clouded with Rev.1 noted. Prepared by Tully & Associates page 1 May 21, 2015 6. Lighting Calculations — Lighting calculations are in compliance with the 2012 Washington State Energy Code. Please see the attached Interior Lighting Summary and the Interior Lighting Summary — Space by Space. page 2