20150601124256805.pdfMay 26, 2015
Attn: City of Edmond, Department of Planning & Community Development
(Permit# BLD20150322)
Re: Kidd Residence
932 Olympic Ave.
Edmond, WA
This letter is in response to your plan review comments for the above -referenced plan. The responses
are listed is in the order of the review comments.
Structure:
16 The Portal frame detail had been revised to meet the ratio, please refer to sheet S1
17 A note had been removed from the sheet
18 The foundation had been revised for this comments
19 The foundation details had been revised for this comment
20 The plans had been revised for this items
21 A beam had been added on the plan for this comment
22 A notes had been added on the plan for the hanger
23 The plan had been revised for this comment
24 See comment #20 above
25 New structure calculation package had been provided for this comment
26 New structure calculation package had been provided for this comment
General:
1. Category 1, small site drainage design was on the siteplan, please refer to siteplan
Site Plan:
1. All utility was on the revised siteplan
2. The driveway width was on the siteplan
3. Construction entry was on the site plan
4. See comment #3
5. The slope of the driveway was added on the siteplan
6. A note had been added on the siteplan
Stromwater/utility Plan:
1. A note had been added on the plan for this comment
2. Strom design was added on the siteplan
3. All tightlines was added on the revised site plan
4. Please see revised site plan for this comment
5. Please see revised site plan for this comment
6. Please see revised site plan for this comment
7. Please see revised site plan for this comment
8. A note had been added on the plan for this comment
9. Please see revised site plan for this comment
10. Please see revised site plan for this comment
11. Please see revised site plan for this comment
12. Please see revised site plan for this comment
13. Please see revised site plan for this comment
Grading:
1. Proposed grade was added on siteplan, also refer to architect drawing too
2. Please see architect drawing for this item
3. Detail was added on the siteplan
4. Detail was added on the siteplan
Please feel free to give us a call if you have any questions.
Sincerely,
Binh Tran, BT
Design EProject Engineer
JoahueK8. Ko|ebu. P.E.