Loading...
20150601124313917.pdfr77= %//2 CDA R May 27, 2015 City of Edmonds Building Division ATTN: Andrew Gahan 121 5th Ave N Edmonds, WA 98020 PROJECT: 932 Olympic Ave CDA# 14035 SUBJECT: Response to City Comments 932 Olympic Avenue Edmonds, WA PERMIT NUMBER: BLD2015-0322 PARCEL NUMBER: 00548900002012 Dear Andrew Gahan: Below are our responses to your comments. Please refer to the included response letter from the structural engineer for the structural portion. SHEET A-0.1: I . General Notes — Emergency Egress: revise note to read "...The finished clear opening shall be 44" max. IRC R310." Response: See drawing A-0.1. The note has been revised to say "The finished clear opening shall be 44" max, IRC R310." 2. Please remove Plumbing and Mechanical from the deferred submittals list, as they are included in this building permit, and plans are not required. Response: See drawing A-0.1. Plumbing and Mechanical reference as deferred submittal has been eliminated. 3. Revise the WSEC energy code requirements to show U -factor of 0.28 and Floor R -value of 0.38 to support the path of compliance to the energy code under the `Code Information' section. Response: See drawing A-0.1. The U factor of 0.28 and Floor R -value of 38 was in the energy code requirements. F:AJOBS\14035 932 Olympic Ave\Ward\City\Comments\RESPONSE'1'0 CITY COMMENTS 4-20-15.doc Carl F. Pirscher, AIA Principal 20011 Ballinger Way NE Suite 200 PO BOX 55429 Shoreline, kVashington 98155 Tel: (206)-368-9668 Fax: (206)-368-9558 SHEET A-2.1: 4. Floor Plan Notes - Note 1: revise note to read "...all bathrooms, toilet rooms and laundry room per IRC M1507." Response: See drawing A -2.L The Note 1: all bathrooms, toilet rooms and laundry room. Per IRC M1507 has been added 5. Floor Plan Notes - Note 2: this note makes reference to the electrical plans for smoke detector locations, however no electrical plans were provided. Please show the locations of the smoke detectors on the plan. Additionally, update the Code reference to R314. Response: See A-3.1, and A-3.2 for the location of the smoke detectors. 6. Identify all safety glass where safety glass is required per IRC R308.4 including at the stairs and at the entry door sidelight window. Response: See A-2.1 the window with safety glass has been identified. 7. Provide a carbon monoxide detector per IRC R315. Response: See A -2.l for location of the carbon monoxide detector SHEET A-2.2: 8. See comments 4, 5 and 7 above. Response: See A-2.2 Note 1: all bathrooms, toilet rooms and laundry room. Per IRC M1507 has been added, See A-3.1, and A-3.2 for the location of the smoke detectors and A-2.2 for the location of the carbon monoxide detectors. 9. Identify all safety glass where safety glass is required per IRC R308.4 including at the stairs and above the master bathtub. Response: See A-2.1 the windows with safety glass has been identified. SHEET A-5.1: 10. Please revise the scale reference from 1/8" to the appropriate scale. Response: See A-5.1 the scale reference is now %" =1'-0" SHEET A-5.2: 11. See comment 10 above. Response: See A-5.2 the scale reference is now '/ " =1 '-0" 12. There is a window at the upper level of the North elevation that does not appear on the floor plans. Please reconcile. Response: See A-5.2. The window on the north elevation has been taken out. SHEET A-6.1: 13. See comment 10 above. Response: See A-6.1 the scale reference is now %" =1'-0" 14. The blow-up detail bugs reference details on sheet A-6.2. That sheet was not included with the submitted plan set. Response: The project is to be by a negotiated bid between the owner and contractor. The detail references have been removed from the building sections. F \JOBS\1 4035 932 Olympic give\Nord\City\(_,O1)1111ealtS\RFSPONS(_. TO CITY COiMIM iN'l S 4-20-15.doc Carl F. Pirscher, AIA principal 20011 Ballinger Way NE Suite 200 PO BOX 55429 Shoreline, Washington 98155 Tel: (206)-368-9668 Fax: (206)-368-9558 SHEET A-7.2: 15. Identify which windows will be safety glass per IRC 308.4. Response: See A-7.2. Windows that need safety glass has been identified. SHEET Sl: 16. Please clarify how the portal frame either meets the height to width ration set forth by the AW&PA SDPWS, or verify that the floor plan configuration meets the prescriptive method of design. Response: (by structural engineer) 17. Remove the reference to the Seattle Building Code. Response: (by structural engineer) SHEET S2: 18. The foundation plan represents the use of isolated footings throughout the crawlspace and below the deck. However, the geotechnical report (dated 5/7/13, Job Number 21401 provided by Mark K. Dodds, PE) recommends that isolated footings not be used. Please clarify. Response: (by structural engineer) 19. In addition, please verify that the footing substrate material recommended in section 6.2 of the above -referenced has been incorporated into foundation plan. Response: (by structural engineer) SHEET S3: 20. It appears that several loads were omitted from the gravity design resulting in overstressed beams/headers as shown on the plan. Please retrace the loading throughout the structure and upsize any structural elements as required. Response: (by structural engineer) 21. No calculation could be found for the double joist at the south end of the cantilevered deck, supporting a header point load above. Response: (by structural engineer) 22. Provide hanger specifications where hangers are to be used. Response: (by structural engineer) 23. The detail bug `205' shown at the 6x10 beam appears to be in error. Please clarify. Response: (by structural engineer) SHEET S4: 24. See comment #20 above. Response: (by structural engineer) STRUCTURAL CALCS: 25. The ENERCALC printouts provided show that the analysis has been performed under the 2009 IBC. Please verify that the design (to be) submitted satisfies the current code. Response: (by structural engineer) 26. In addition, please include the end reactions for each beam/header in the print out sheets to help with review efficiency. Response: (by structural engineer) F:A.IORS\14035 932 Olympic AI.SPONSF"1MCITY COMMFayTS 4-20-15.doc Carl F. Pirscher, AIA principal 20011 Ballinger Way NE Suite 200 PO BOX 55429 Shoreline, Washington 98155 Tel: (206)-368-9668 Fax: (206)-368-9558 Please do not hesitate to call if you have any questions. Sincerely, CDA ft PIRSCHER I RCH�,TECTS , INC. AP Principal Carl F Pirscher, AIA Principal 20011 Ballinger Way NE Suite 200 PO BOX 55429 Shoreline, Washington 98155 Tel: (206)-368-9668 Fax: (206)-368-9558