Loading...
20150610114036666.pdf�-� ��[_[_� U \ �� ����[�[�����\/��[~�� DESIGNS LLC. 127333911xv�we 1110m.2(Y).650»296 SEAITLL, WA 98125 -MAIL: SOARNESUCORNERSTONEARCHCOM June 7\2U15 City ofEdmonds 1215 1h Ave. N Edmonds, VVA98020 At n: Chuck Miller &]en Machuga Re: BLD2015-0224 BUILDING PLANS REVIEW COMMENTS 1. Fuel Gas: Btu's of individual pieces of equipment have been added to sheets A2.1 and A2.2.. 2. AC1 Energy Notes: a) Note B, duct fasteners and air leakage test requirements have been incorporated into note. b\ Note F,changed asrequested. 3. ACI Energy notes: a\ Note C,Air leakage rate requirements and posting have been identified as being in accordance with SEC 402.4and SCE 4O2.4.1.2respectively. 4. AZ.1First Floor Plan: a> The sections have been changed this time tobecorrect. 5. A2.2 Second Floor Plan: a\ The sections have been changed this time to be correct. b\ Sliding glass door width has been corrected on plan so it matches door type and exterior elevation. 6. A3.1 Exterior Elevations, Guardrail detail: Notes have been changed to show maximum 4 3/8" sphere requirements and distance between bars on handrail noted to be 4". 7. A4.1 Building Sections, Sections 2&4:These two sections were incorrectly drawn and have now been redrawn so they show the proper walls where they cut through the building. 8. A6.2 Detail 10: Reference to "O/41.2" has been removed and Zmetal that i\ referred tois included at top ofdetail. 9. S1Structural notes: The reinforcing schedule has been changed toitmatches the reinforcing called out indetails. 10. 32 Details A8' B; a\ Details 8, Ca||nut 3A/82was changed to34/S4. b\ Details B,CaU|out2/62was changed to2/S4. 11. S2 Details A & B; 4x6's have been changed to 48 to coordinate with detail callouts. 12. S2 Foundation Plan: Dimension between centerline of steel tubes of braced frame has been coordinated with 4/32. 13. S3 Second Floor Framing Plan: a) Beam with wall load above has been change toS1/8"x12GL8. \U� b) 4X10that was missed has now been changed to4x12. 14.S4Roof Framing Plan: a) Deck on north side of house has been removed. Correct overhangs and details are now shown. b\ Same asitem oabove. 15. S4Detai|9:Back'spanofcanti|evenedroofjoistsdoesn'tendoverbeamthatis|essihan48" from exterior wall. Entire system sits on top of roof deck supported by truss beam. PLANNING REVIEW COMMENTS 1. Height calculations have been confirmed and height is called out on site plan and building elevations. Z. Building has been modified tncomply with building area requirements. Building area drawing has been provided on sheet Al. Area includes exterior stair area that is more than 30" above grade and roof overhang area that isgreater than 3O". Sincerely, Steve Barnes