20150610171207716.pdfJune 4, 2015
JoAnne Zulauf
City of Edmonds
Public Work Department Department
1215 th Ave North
Edmonds, WA 98020
Re: 2230395 th Ave W
BLD20141014
Dear Ms. Zulauf,
This correspondence is being provided in response to your comment letter dated May 5, 2015, and
accompanies our resubmitted plans. Each response below corresponds to your comments.
Site Plan
No Comments
Water
4. The water service has been relocated outside of the drywell.
Sewer
5. The sewer service has been relocated outside of the drywell.
Storm
a. The drywell detail has been added to the plans and the required setbacks have been noted as
well.
b. Invert elevations have been added for the proposed CB, and for the 6" pipe entering the
drywell.
C. This comment requires no design changes per my telephone conversation with you.
d. A note detailing the aggregate size has been added to the detail.
e. The sewer service has been re -designed to stay out of the drywell.
f. The water service has been re -designed to stay out of the drywell. A note has been added to
"sleeve" the water as it is too close to the sewer service.
g. The numbering has been updated and the "storm" designation added as suggested.
h. The trees to be protected have been added to the sheet(s).
L Clouding has been removed.
j. Written response is included herein.
Dry Utilities
No comments
TBSC
No comments
The attached plans, and the above responses address the City comments. Please contact meifyou have
any questions orcomments. VVeare looking forward tostarting construction assoon aspossible.
Please let meknow ifthere isanything | can dotnassist ingetting permits.
Thank you for your help and assistance.
Since |
]ohnMinante
PadUcRidge—DRHLLC