Loading...
20150616122547629.pdfO(.,ElJ4j �M'.. -1111044 ACLL _P'�1'I'T -III C�� J rr � utl"tl�l ,i . � I Prior la isstgmice p/'a permit, ihis,i'arm musl be c:ompl'eied hi its CWirWy and ivicrr uec! ill /he 01-P bi, rrppi-oval, The c.crmplelec/,/"tofu fie list halpesii;a ulfwes 0j'achiloavle(/r°-weiel hj) cr// pc -fles. DU T11 S AND RE SPOPISIBIOUTIES `� aeri2al ]hrstnectiorr Ili�ru� �arr�I �ipecial l(easpe�tmwsa. The Special Inspection firm of ( , f � , w � , _ d << _ will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): _Reinforced Concrete —Bolting in Concrete Prestressed Concrete 5lnoterete Structural Masonry Spray applied Fireproofing _Smoke Control Systems Lateral Wood _Structural Observation by design professional Gracling/soils _Structural Steel/Welding _Other _High Strength Bolting _Other All individual inspectors to be employed on this project will be WABO certified for the type ofwork they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the Nvork and testing required by the project design and specifications. The work shall be inspected for conformaacc with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they leave been approver] by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing Avas completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Umar:.l6��nluua;lll�sl;lnra\i3uildu�tt'kd� w P�Ild� i _2U 1inniacclion Anil dAw'/'i/L0H Coil tu"I 4,ft) R", The cootrac to I- shall provide the special inspector Or agency oder utile 1106 11 Gat i0l I Of' Work FeCILlil'i I I J.' inspection. The City approved plan and specifications must be made available, at IIH-jObSife FOr the LISC ofthe special inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions arc considered to be in addition to the normal inspections performed by the City and (lie contractor is responsible fOr contacting IIIc City to SCIIMI-110 regular iffipeCdOlm NO0 1 I all licrete shall bye poured Or otlicr work covcl-ccl until approval is given by the City inspector. Building Deo m-Wic ' qt - The building department shall review all), revisions and addenda. The Cil), inspector will monitor the special inspection I'mictiorm for compliarice, with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed, P�e�rify . 'sSiolmls: 'I'll(, architect and/or engineer will clearly indicate on (lie plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process ill such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. OwIler. The prqject Owner' Or the architect Or engineer acting as the owners agent, shall employ the Special inspector Or agency. ENFORCEMENT A failure of the special inspector or fli'll) to perform in keeping with the requirements of the JBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. in such a case a new special inspector alld/01- fil-111 would need to be proposed for approval. A failure of the design and/or COIlStrUCti0D parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGME, PITS I have read and agree to comply with the terms and conditions of this agreement. Signature P, Date SigllatLII-e Date Contractor: psi POPE',, 0/01 C)" V, - "I lb 'ply 7//," (,f"p A rch./Eng: Signature— Date: MA, R I wo, Special Insp.—Lb V) Signature— Date: 0), l) C"I V, Special Insp. Agency WX) 3 ACCEPTED FOR THE CITY OF EDK/I01\1DS BUILDING DEPT. Milo CAI Ist, I s\I)Jol b; 1(1\1-k,� I, (opq I I I i I d i I) �� Hua % I 'o I der A I O\Vol I )IS\'; poc in I i I Is I) c I iol I 161111 d or?/d/A Id