Loading...
20150618105520089.pdf1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 kpFf.com June 17'2O15 Ms. Jeanie McConnell City 0fEdmonds Public Works Department Engineering Division 121 Fifth Avenue North Edmonds, VVAB8O20 N0 Subject: Permit Aon|ic8Uon#8LD2O15O490 Edmonds School District Sherwood Elementary School Response h3Public Works Comments —2""Set Dear Jeanie: The following outlines our response to City of City ofEdmonds Civil Plan Review comments date June 16, 2015. Your original comment letter is enclosed for reference. ECT--T,T�� 1. Thank you for providing 8 CDSt 0SUnn8t8. H88S8 nV(e, inspection fees will be C@|CUb]hed using this estimate, however, a recent determination has been made that a performance bond will not be required from a public entity such as the school district. 2. Response letter acknowledges [rain garden covenant] requirement. Response: It was noted in a previous c0D101eOt that the City vvnU|d forward 3 template. Please provide. 1. Kpff responded as follows(item 13 in their response memo): "Per discussion on May 15.2015' DliDeF8| @gg[gateh/pe 26 (3/4" washed sandy gravel) is now included in the rain garden profile, in p|8C8 of the g9ot8xii|e fabric between the infiltration basin and the biorention soil." This layer is not shown in the Typical Rain Garden section, on sheet C3.03 but should be. C8UOUt updated on this sheet to indicate that @% washed sandy gravel is to beused inthe rain garden profile, instead 0fg8Dt8Xt|Bfabric. Sheet C3.O3iSrevised and n8-aUbnniUBd. Ms. Jeanie McConnell June 17, 2015 Page 2 Sheet C4.01: 1. The turning movements included on plan sheet C0.02 show that a van would barely make the turns and/or would likely be on the curb against parked cars to do so. Please confirm the owner is acceptant of the proposed design. If so, the City will also accept the design as the movements will be on private property and therefore any damage to infrastructure would occur on private property. Response: Edmonds School District has reviewed and confirms the movement is acceptable as shown Sheet 04.02: 1. A landing needs to be provided at the curb ramp across the drive aisle from R7. Indicate ramp section on the plans. Response: The concrete area across the drive aisle from R7 is a ramp landing at the bottom of the ADA ramp run. A detectable warning surface is provided on the ramp landing at the curb cut for the transition to the drive aisle. Sheet C4.02 has been revised to include a callout to the grading sheet for additional grading detail. Slope information (2% max) has been added to the landing on sheet C3.03. Jeanie McConnell has confirmed this as acceptable, per e-mail discussion on June 171" Sheet C6.01: 1. Curb ramp R2, R3 and R5 do not reference the plan sheets in which they are located. Please revise. Response: Curb ramp table is revised to include plan and detail references for each curb ramp. Sheet C7.01: 1. Reference to ramps R4 and R6 have been removed from the plan set. Please revise as needed. Please note, Detail 5 on C4.02 still references these ramps. Response: Ramp information for ramps R4 and R6 have been removed from C6.01. Reference to these ramps has been removed from detail 5 on C4.02. Sheet L1.01: The landscape plan (sheet L1.01) specifies "Northwest Bioswale Mix." Rain gardens are not bioswales. Bioswales are used to convey flows and give some treatment. The grasses specified are not appropriate for rain gardens. Rain garden (bioretention) plants need to be selected for the 3 zones found in these BMPs. See section 6.1.2 and Appendix 1 of the 2012 "Low Impact Development Technical Guidance Manual for Puget Sound" for choosing the correct plants. Response: Landscape Plan sheet L1.01 has been revised. Planting zones 1, 2, and 3 were added to the plan to accurately show the extents of the rain gardens. The plant legend was expanded and delineates the locations for the plant materials for each Ms. Jeanie McConnell June 17.2O15 Page planting zone and the plant materials meets the criteria set out in Appendix 1 Ofthe 2O12 "Low Impact Development Technical Guidance Manual for Puget 80UOd." 2. All disturbed converted and disturbed pervious areas within the project one8DlUSthav8 soils 8Dl8Dded per Ecology BMP T5.13, Post -Construction QOi| Quality and Depth. Response: The project 8pecificatiOnSS8CtiOn328115Soi|P[8p8rGiioDvV8Sn9vined. The Washington Department OfEcology BMP T5.13reference was added b}Part 1' paragraph 1.1 Related Documents. The rest Ofthe specification meets the requirements laid out bythe Ecology reference. Hopefully these [88pOn8en meet with your approval. Please feel free to contact me directly at (206) 622-5822 with any questions or comments. TJE:W| Enclosures 114407.21