Loading...
20150622101230083.pdf�~������_� K | �� �7����[��^�����[~�� 12733 3911ma� we PHONE: 206a50»296 SEATTLE, WA 98125 EMAIL: SOMMESOCORNERSrONEMCILCOM ]une1O,20lS City ofEdmonds 1215" Ave. N Edmonds, VVA9OO20 Attn: Chuck Miller Re: BLD2015-0224 |UN ' U/� ouN l( .�/ } , BUKD/N���PAP T BUILDING PLANS REVIEW COMMENTS 1. AC1; Energy Notes: As requested we have added the note to provide Option 2b with associated are leakage requirements and heat recovery ventilator. In addition modified the water heater Option 5a notes to be more specific. Copied information from Prescriptive Energy Form requirements ontodrawings. 2. S1; Foundation (footing) reinforcement: Footing reinforcement note instructural notes are typical unless otherwise noted. 3. S3; Beam sizing over west end ofbuilding was changed. We should note that these changes were made at your direction, not because they didn't comply with code. They now exceed code which vvecan live with. Sincerely,