20150622101230083.pdf�~������_� K | ��
�7����[��^�����[~��
12733 3911ma� we PHONE: 206a50»296
SEATTLE, WA 98125 EMAIL: SOMMESOCORNERSrONEMCILCOM
]une1O,20lS
City ofEdmonds
1215" Ave. N
Edmonds, VVA9OO20
Attn: Chuck Miller
Re: BLD2015-0224
|UN
' U/�
ouN l( .�/ }
,
BUKD/N���PAP T
BUILDING PLANS REVIEW COMMENTS
1. AC1; Energy Notes: As requested we have added the note to provide Option 2b with associated
are leakage requirements and heat recovery ventilator. In addition modified the water heater
Option 5a notes to be more specific. Copied information from Prescriptive Energy Form
requirements ontodrawings.
2. S1; Foundation (footing) reinforcement: Footing reinforcement note instructural notes are
typical unless otherwise noted.
3. S3; Beam sizing over west end ofbuilding was changed. We should note that these changes
were made at your direction, not because they didn't comply with code. They now exceed code
which vvecan live with.
Sincerely,