Loading...
20150626162744984.pdfMch 16., 20 10 1 -[WA Project No, 10011.74--21-1.300 TO: 13uilding Official fsdrnonds De-velolnnent 'Se viccs 121. 5t" Avenuc North, Second floor MOM, TIA 980:10 _CC: David Fritschen and Deborah Stewart; 1921.`1 1.3"' Drive SE Bothell, WA. 913011 'r:cl7jeCt: FINAL I;I'iY13'I'C3I ii'I;i.0 LiNG3PECTIONS FriPr°opewty Developnrd nt 1'631 ,1"' I�hicc, Ww t, Hchhioit ds, WA C,.ty of 0i;clniotr4J;, llern'iit: No. 2,009,,0376 11\VA C eW,3cicnices Inc. UIMIA) provided geotechnical special itus'pection and testing servic(""> 1'6r the above -subject project, The work bcf;an in late S(-,ptembcJr, 1009, and vas siibstarrtially complete by early March, 51010. Our special inspection and testing seances included the Mowing ehnnents: () Periodic to full -tinge inspection of all site earthwork. 0 periodic inspection of underground utility consA.ction and backlillinr3. Periodic inspection of tern.porary excavations and construction of the rock -faced gravity retaining wall along the south and cast sides of the property. I"ull tinge inspections loaca tcstinlY and welding inspection of 4 --inch d.ianletwr pipe piles (pin piles) that were installed for foundation support for the iww strucWro A total of 75 pin piles were installed. U Inspection, sampling, and testing ofreinforced concrete construction, "Verification of temporary and pernianent erosion control measures, and genc:tal peri.odic.; site monitoring. l'hesc, inspections wc;re; completed on an awneeded basis to satisfy City's S'penial Iuspec(iows crd Testing reduiremwnts. The undersigned also participated in a pre..constt,uction c ord.'e.rcncc tivith the, owner/general contractor and City of Edmonds staff on July 20, 7009, A total of 38 held inspections were cornpleted by HWA. represent Mves between. f A � Ah 0 S pternber :1A, 2009 and lvlareh 1, 2010. Copies of our daily field reports (nurnberc-d FR -001 through FR -038) are included vvith this finch report. " t March 26, 2010 HWA Project No, 2003-174-21-1300 To the best of our knowledge, all of the work performed that we were responsible to provide special inspections and testing services for, was done in conformance with the approved plans and specifications. There are no non -conforming issues, unresolved issues, or any discrepancies in inspection coverage that we are aware of. If you require additional information or we may be of further service, please contact the undersigned at (425) 774-0106. Sincerely, HWA GEOSCIENCES INC. V D Erik O. Andersen, P.E. Senior Geotechnical Engineer, Vice President Attachments: HWA Field Reports FR -001 through FR -038 2003-174-21-300 Final Report of Construction Inpsection 2 HWA GEOSCIENCEs INC.