Loading...
2015-0639 Pruett addition-proposed ADU 4-Shapiro Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 26, 2016 TO: AD Shapiro Architects Tony Shapiro tonys@adshapiro.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-0639 nd Project Address: 9011 192 Street SW Project: Pruett addition-proposed ADU Scope: Addition and remodel to existing SFR - proposed ADU not required to be separated per IRC definition of dwelling unit, item 3 – R-3/U occupancy group – V- B construction – mechanical and plumbing included disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. On sheet A 101 – Cover Sheet, Code Notes, Vicinity Map, Project Team: Energy Code Data - Note #8 and #16 – Clarify the selected WSEC Table 406.2 option ‘3 d’ (note #8) and option ‘4’ (note #16). The existing structure is noted by the Snohomish County Assessor’s office and in the ‘Scope of Work’ – Note #5 – as being heated hydronically. The response to the plan review comment states: “Energy Code: drawings are modified to use a. 1a. .5 credit efficient bldg envelope nd b. 3d. 1.0 credit high efficiency zonal electric heating heat pump equip for 2 story heater/cooling c. 5b. 1.5 credit efficient tankless gas water heating system.” Regarding note #8 –The selection ofoption ‘1a’ cannot be used because the required modifications to the floor insulation and slab insulation either cannot be met (there is not an ‘underfloor’ or other floor over an unheated space) or are already required prescriptively. Modifying the windows only is not sufficient to develop the .5 credits. There does not appear to have been a proposal to reduce the total UA by 5% per WSEC R402.1.4. As noted earlier, only option ‘3d’ develops credits for a proposal that benefits only a portion or ‘zone’ of the structure. However, option ‘3d’ regards homes primary space heating system is zonal electric heating where the , not hydronic. Regarding note #16 - Option ‘4’ regards the installation of a furnace to provide the required comfort heat through a ducted distribution system. The furnace and all ductwork are required to be located within the conditioned space. AFUE (Annual Fuel Utilization Efficiency) is a thermal efficiency measure of a combustion appliance, such as a furnace selected under this option, and not an electric heat pump. As with most of the options, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency of the primary means of providing the required comfort heat per WSEC Table 406.2. Page 2 of 2