Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
20150702102758565.pdf
© o Q Civil Engineering Design and Consulting V; 206 406 9965 F: 206 770 6330 1031 NE 65 tt Street #158 email@cspen91neer1ng.com � ?,i Seattle, WA 98115 www.cspengineering.com June 11, 2015 RE: BLD20150375 Plan Review Corrections Dated 05-07-15 City of Edmonds 1215th Ave North Edmonds, WA 98020 Provided below are responses to the above referenced plan review corrections: Plan Cl: Stormwater Plan: 10. The plans have been revised and no longer conflict with the City's water outage policy. 11. The plans have been revised as requested. 12. The keystone walls have been eliminated from the project. 13. The plans have been revised as requested, 14, The plans have been revised as requested. 15. The plans have been revised as requested. 16. The plans have been revised as requested. 17. The plans have been revised as requested. 18. The plans have been revised as requested. 19. The plans have been revised as requested. 20. The plans have been revised as requested. 21. The plans have been revised as requested. Plan C2: Grading/TESC Plan: 1. The plans have been revised as requested. 2. The plans have been revised as requested. Respectfully Submitted .Jeff Haynes P.E. CSP Engineering Inc. P.S.