20150714151911706.pdfMark Travers July 10, 2015
Architect Chuck Miller, Plans Examiner
Building Division
City of Edmonds
121 5'" Ave North
Edmonds WA 98020
Re: Plan Check — BLD2015-0447
Project: Hellene Remodel — Proposed ADU
Address: 18908 Olympic View Drive
Dear Mr. Miller:
This letter is in response to your review comments dated June 02, 2015. We have updated our
drawings and have noted the changes below:
General Review Note, on sheet A2.1:
a. Location of the nature service shut off valve is relocated to be on the north wall of the
kitchen.
b. The thermostat in the hallway is to be correctly marked as W. The 'Whole house
mechanical ventilation (marked `5') is located in the storage (belonging to the Primary
unit), serving the Primary residence and separate from ADU heating system.
c. The electric service disconnect shown on the plan
d. - Location of the nature gas service shut off valve shown on the plan
e. The means to be used to provide comfort heat for the portion of the ADU ?
f. The method to be used to provide the required whole house mechanic ventilation per IRC
M1507.3 for the ADU provided on the plan.
4. Proposed Main Floor Plan:
a. The window in the east wall of east bedroom on the main floor is corrected as window type
`A'. No change on the window schedule on sheet A3.
5. Proposed Basement Floor Plan:
a, b, c. The structural Engineer has provide the existing framing plans. Please refer to new
sheet A2.3.
The revised sheet A2.1 and new sheet A2.3 are included in the re -submittal.
Please contact our office if you have any questions on this project.
Sincerely,
Myloan Nguyen — Project Designer
Mark Travers Architect AIA
206 / 763.8496 P
206 / 328.3238 F
Why Too Que
Building
2315 E Pike St
Seattle, WA 98122
marktraversarchitect. com