Loading...
20150715152141779.pdfTim and Wendy, lleco are my notes below to these additional reviewers comments. See first email for previous notes. Thank you, Good afternoon, | have reviewed the May 21permit submittal onbehalfoftheP|anningDivisinnandhaveafewconectionu: 1) On the Site Plan, please label the datum point and its elevation, whether actual or assumed. Also, onthe Sheet A7 show the lines of average original grade, proposed height, and maximum allowed height. Refer toHandout 13,41for further guidance. [RCB/Mark] show/n asyumed datum and e|evadon on s|te, Shomn grade proposed hQt andmaxonsh(etA7� 2)Onthe Site Plan, a35%value isshown for 'Maximum Impervious Lot Coverage'. The 35%maximum isactually for structural lot coverage, which includes "the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area." (ECDC 21.15.1I0). Please break out the structural lot coverage for the house, porch and addition elements and calculate the total structural coverage as a percentage of lot area. |PCB/MarN revised and shown nouteplan Comments from other reviewenmayheforthmming—it'susua|ly best towait until you've received comments from all reviewers prior to resubbing. go MikeOugSLon, AUCP City of Edmonds I Associate Planner 425-771-0220 Development Services Hours: AS OF JUNE 3RD—WEDNESDAY—CLOSED