TRANSMITTAL:
L:
PROJECT: ANDERSON RESIDENCE REMODEL
Pergola and Fireplace Wall Design
Plan Check No. 2015-0722
TO: City of Edmonds, Planning Division
121 5t" Avenue N
Edmonds, WA 98020
ATTN: Mike Clugston, AICP, Assoc. Planner
WE TRANSMIT: (x) herewith via Hand Delivery
O in accordance with your request
THE FOLLOWING:
() Original Drawings
() Diazo Prints
(x) Photocopies
O
ARCHITECT'S
PROJECT NO.: 2015/102
DATE: 28 July 2015
FOR YOUR: ( ) approval
() review/comment
( ) use
(x) record
COPIES: DATE: DESCRIPTION:
1 7/28/2015 Architect's Response Letter to PC Corrections List as issued by
the City of Edmonds on 9 July 2015.
2 7/28/2015 Letter Summary from Earth Solutions NW, LLC, providing Slope B
Buffer Consultation (geotechnical report) for the project.
3 7/20/2015 Reduced -size Site Plan, Sheet A-1 and Development Tabulations
REMARKS:
We are providing this supplement to the Plan Correction Response, having already submitted
for review the revised Drawings to Engineering on 23 July 2015. The letter summary is from
Earth Solutions, the new name for the original geotechnical engineer for the entire
development in 2002.
Please let me know if I can answer any questions you might have. Thank you for your
assistance.
COPIES TO: w/ encl: BY:
Dave & Stephanie Anderson ( )
�ik,ha)rA. Oki r '
to, Architect
.
ARCI 111 .CTURE, PLANNING, G, RESTYWRAN T IN u ll;lR]COR
924 2251" " Mace SVV, Edmonds, VVA 98020..5924 CeH (425)697 0983 eniafl w raoaV cc i@! wu iiidsN i" Tig.c()rn
28 July 2015
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
Attn: Mike Clugston, AICP, Associate Planner
Re: ANDERSON RESIDENCE REMODEL
20903 Pioneer Way, Edmonds, WA 98026
Plan Check #2015-0722
Plan Check Correction Responses
Dear Mr. Clugston:
Please find herein a list of responses we are making to your original Plan Check Correction Letter, dated
9 July 2015. I will make reference to your Item Numbers in this response to assist in providing clarity
for this processing.
All Plan Check Correction changes are identified on the Resubmitted Drawings by revision "clouds" and
Delta No. 1, dated 21 July 2015. These drawings were submitted to Jennifer Lambert in Engineering on
23 July 2015.
Item No. 1:
Geotechnical Report.
We are providing (2) copies of a Geotechnical Recommendation Letter providing Slope Buffer
Consultation, dated 28 July 2015, from Steve Avril, Project Geologist of Earth Solutions NW, LLC, which
is the new name for Earth Consultants, Inc., that prepared the original geotechnical report for the
Pepperwood Residential Development in May of 2002, for this PRD -2002-171, of which the Anderson's
property is a part.
Item No. 2:
Site Plan (Sheet A-1).
The combination Site and Floor Plan has been modified to show the requested location and
layout of the concrete step and landing arrangement for making the grade change from the existing
driveway at the lower Garage level to the main level Entry Porch area. It has an area of 80 s.f.
Item No. 3:
Setback Encroachments.
In order to respect the 5' sideyard setback on the north and the 10' rear yard setback on the
east, the Pergola structure has been modified to eliminate the beam extensions on two sides of the
supporting, stone -clad columns of the Pergola. The beam extension elimination is shown on various
drawing exhibits:
a.) Site/Floor Plan, Detail 1/A-1
b.) Developed South Exterior Elevation, Detail 2/A-1
C.) Pergola Framing & Glazing Plan, Detail C/A -2
d.) Beam Connection @ Steel Tube, Detail 2/A-2
Plan Check Response Letter to City of Edmonds
Anderson Residence Remodel, Plan Check #2015-0722
28 July 2015
Page 2
In order to respect the 10' rear yard setback, all structural footings, including the steel column
footing and all concrete pier blocks for the new Timbertech deck framing are dimensioned and noted to
be located no closer than 10' from the rear property line along that rear setback line. Where the
Timbertech decking is shown overhanging the rear setback line by approximately 6", it is supported on
cantilevered framing with assembly that does not exceed 30" in height above adjacent finish grade.
Item No. 4:
Structural Lot Coverage:
New Lot Coverage Calculations are now shown on Sheet A-1.
I am also submitting for your reference a copy of the original Site Plan and Development
Tabulations from the City Street File for this property, date July 2005, which was used for reference in
preparing the Lot Coverage Calculations for this current application for permit.
Item No. 5:
Height Calculations:
Maximum Structure Height Calculations are now shown on Sheet A-1.
The Developed South Exterior Elevation, Detail 2/A-1, now shows the following related to height
calculations:
a.) Calculated Maximum Roof Elevation
b.) Actual Highest Roof Elevation
C.) Main Floor Finish Elevation
d.) Average Existing Grade Elevation
e.) Highest Pergola Roof Elevation
I would appreciate it if you have questions regarding these Plan Check Correction Responses that you
would please contact me for clarification, as we are anxious to finalize all code compliance questions
and to begin construction. Thank you for your assistance.
SinFerely yours,
ich d A. Okim"Oto, Architect
cc: Dave and Stephanie Anderson
SAW Construction