Loading...
20150803131943.pdfI� Design Build 5ervice5, Inc. Engineering & Construction Management 28119 -120th St. 5.E., Monroe, WA 98272 Phone /F -AC (MO) 79,15-9659 E-mail: rheideOdbromonroexom July 31, 2015 HENRY BYAM (WESCO CONSTRUCTION) PO BOX 5003 LYNNWOOD, WA 98046 Phone 425-771-0926 ext. 237 hb@wescogroupinc.com Subject. Response to Comments Dated October 7, 2014 Plan Check: BLD2014-0821 Project: White SFR Project Address: 8545 Talbot Road As requested I reviewed the following comments and have the following responses. 5. Main Floor Plan a. The upper floor is comprised of two sub -diaphragms. It is clear how the two sub diaphragms are transferring shear load on three sides, and intermediately. However, please clarify the shear path of the lateral load generated by the upper floor diaphragm along the interior halves of the aforementioned sub -diaphragms - Response: The upper floor is treated as an open diaphragm along the interior edge. All loads are taken to the outside walls. With the column added for y support it will also act in the x direction. b. It appears that the sub -diaphragms comprising the upper floor do not conform to the aspect ratios provided in the AF&PA SDPWS section 4.2.4. Please justify. Responses I have added a steel column acting as a frame to take the load to the roof and to the main floor. The steel column is a HSS6x6x318 Steel column with ECCQ buckets welded to the sides to carry the beams, and a Y4"x16"'x16" steel plate welded to the side to attach to a Truss or 1.75x16 LSL drag strut designed for 6320". 16-1/4°x1 W SDS screws will transfer the load to the column. c. Please provide calculations to show that the upper floor diaphragms are not overstressed without blocking. Response- Attached are calculations showing the Case 1 unblocked diaphragm is adequate for the loads to be transferred. If you have any further questions or I can be of any further assistance please call me at the above number. Rick Heide, P.E. President Attachments 11S