Loading...
20150819134819.pdf`LAN REVIEW COMMENTS BUILDING DIVISION %W3(425) 771-0220 DATE: August 5, 2015 TO: Dan Weller c)I�r�.t�ig;«w�ll�u G��� 41�1)d„lt�Itr�lw FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-0723 Project: Wells Addition Project Address: 1228 Coronado Place S. During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Shee11* For consistency, please label each shear wall with the appropriate designation, specifically those shear walls along the rear wall ,°' °000 �. Include a smoke detector outside of a1)d in the vichl ty of bedroom 5 (ii) addition to the one shown within the bedroom) per IRC R314. 1"'i?„ KJ- Shee Specify the sizes of the house -side posts supporting beams 8 (2 locations), the connectors to be used at those locations. ',3M °p Beam 9 is specified as HF#1 in the calculations, but the plans call for HF#2. Verify. Sheet ,, Specify the hangers to be used at the low roof trusses and at the floor joists to be hung from bean) 3, or provide a detail for both. Stitt. 044 , "VIA -0 It appears that the cantilevered floor joists are missing the concentrated loads at the cantilever enol accountia)g for the low roo97, wall and upper wool" supported by those joists outside of the 10' header above. Please verify the joists adequacy with the addition of those loads. In addition, specify the rim joist to be used and verify its adequacy to support the point loads generated by the 10' header al)r)ve. l 0PPIA, Kodf fI ITY PJJ1t4(.a( 111's, woiegoon"irtlINV 94KV. lr &, ns, , 1 li g "'l 1 � , �1i JoIS Ili JuVI 5. � CDAP ( ) 14011 t'l I14 F001 lea S t ii Id -515 4 , , 0% Ki o' 1461V& ,� �1 I � PO �� ?',J l l' t wAs t�. Provide a detail for the low roof/rim connection at the cantilever end of the cantilevered joists. ,%M, DETAIL )r)lkf „;, Verify header 2 and the adjacent 4x10 header after reconsidering the loading at floor joist 5, per comment 6 above. Sam t m Sheet `' w For consistency, please label each shear wall with the appropriate designation.,S)". f ° . Specify the post sizes required to support the girder truss, and the headers supporting the scissor hip girder truss. The reaction loads at those locations appear to exceed the capacity of a (2) 2x6 post. SR, t„,14 Page 2 of 2