2015-0831 Shepard addition-garage2 - Munson.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 2, 2015 TO: Randy Munson randy.munson@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-0831 Project: Shepard addition-garage th Project Address: 10222 244 Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Items that recur on this list appear in italics. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet A-6 – Framing Plans, Braced Wall Schedule, Details, and Notes: 1.Braced Wall Panels & Alternate Braced Walls Schedule - Clarify the specified ‘Base Plate Nailing’ for the braced wall panels marked ‘BWP’. It does not appear to be equivalent to the prescriptive requirements of IRC Table R602.3(1). The change made in response to the 16d at 16” O.C. review comments (from ‘16d at 8” O.C.’ to ‘’) is still not equivalent to that required per IRC Table R602.3(1). 2.Floor Framing Plan a.Provide a detail, and a reference to it, for the required construction to accommodate opening in the north wall of the ‘Entry’ on the lower level. Of particular concern is the effect of the opening on the lateral design of the lower level, and the necessary alterations to the adjacent retaining wall. The response to the plan review comment Added Detail #7, Sheet a-7 states: . The added detail, “Eye Brow Roof Detail’ and referenced detail within, Detail #8 – Eye Brow Roof Detail – does not appear to address the concerns of the earlier review comment. b.Clarify the detail reference ‘4/A-6’ for the ‘Portal Frame with Hold-downs’ to be used to resist lateral loads at the west end of the braced wall line along the north side of the structure. It does not appear to meet the minimum length requirements of IRC Table R602.10.5. c.Clarify the callout for the ‘Alternate Braced Walls (ABW)’ to be used to resist lateral loads at the west ends of the braced wall lines along the north and south sides of the structure. They do It does not appear to meet the minimum length requirements of IRC Table R602.10.5. No change appears to have been made to the plans. d.Clarify the callout for the 4x6 posts below each end of beam ‘B 1’ – 7x16 2.0E PSL. They appear to be undersized for the loads anticipated by the represented construction. The ‘total load’ noted in the provided beam calculation appears to be New Column a bit low. The response to the plan review comment states: Calculation and changed Framing Plan. A ‘New Column Calculation’ could not be found among the resubmitted construction documents. No change appears to have been made to the ‘Framing Plan’. On sheet A-9 – Design Load and General Notes: 3.General Notes a.Smoke/Carbon Monoxide Alarms - Note Q.2 – Eliminate the conditional language for the required power source of the smoke alarms to be installed per IRC R314.4. The change made does not appear to address the concerns of the earlier review comment. b.Smoke/Carbon Monoxide Alarms - Note Q.4 – Eliminate the conditional language for the required installation of, and update the required locations for the installation of, carbon monoxide alarms per IRC R315.3. The change made does not appear to address the concerns of the earlier review comment. Page 2 of 2