Loading...
2015-0846 Point Edwards Bldg 10 - Studio Meng Strazzra revision1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: August 16, 2016 TO: Aidan Bird Studio Meng Strazzara abird@studioms.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-0846 Project Address: 50 Pine Street Project: Point Edwards Building 10 – REVISION 1 Scope: Construct 68 unit residential structure – R-2/S-2 occupancy groups – V-A construction - NFPA-13 sprinkler system required– mechanical and plumbing may be deferred submittals or under separate permit(s) – separate permits required for fire systems disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On sheet L201 – Construction Details: 1.Detail 32 – Section: Handrail Section – Clarify the specified handrail height with regard to the applicability of the detail. The represented construction in the detail appears to be that of an area requiring a guard and would have different requirements. A reference to the detail could not be found on the submitted documents. On sheet G001 – Title Sheet, General Notes & Code Sheets: 2.Drawing Index – Add to the plans the following sheets: L201 – Construction Details · L202 – Construction Details · L203 – Construction Details · S302 – Concrete Shear Wall Elevations & Details · On sheet A112 – Level 3 Plan: West: 3.Level 3 Plan – West – Change on the plans the wall type callout along the south wall of space ‘311’ – gridline ‘I-16’ – from ‘21’ to ‘24’. On sheet A114 – Level 4 Plan: West and sheet A115 – Level 4 Plan: East: 4.Level 4 Plan – West and Level 4 Plan – East – Clarify the callout to window type ‘W10’ in the east and west walls of the ‘light wells’ – along gridline ‘D’. There does not appear to be a corresponding window on the ‘Window Schedule’ on sheet ‘A603’. On sheets A120 through A127 – Unit Plans: 5.Unit Plan Notes – Change on the plans the following: Note 2 – The referenced sheet for wall type assemblies and dimensions from ‘G003’ · to ‘G004’. Note 7 – The referenced detail and sheet for the soffit height in the units from ‘25’ to · ‘12’ and ‘A802’ to ‘A805’ respectively. On sheet A130 – Level 5 Plan: Lounge: 6.Detail 1 – Level 5 Lounge – Clarify on the plans the difference in the represented door at the north end of the ‘Lounge’ (identified as door ‘506’ elsewhere) and of that indicated on detail ‘1/A103’ – Level 5 Plan - on detail ‘1/A117’ – Level 5 Plan - East – and specified on sheet ‘A601’ - Door Schedule – Levels 4 & 5. On sheet A201 – Exterior Elevations: 7.Detail 1A – North Elevation – East Wing – Clarify on the plans the representation of the operable portion of the following windows/sliding glass doors: The windows ‘marked’ elsewhere as ‘W1’ at gridline ‘2.25’ · The windows ‘marked’ elsewhere as ‘W1’ at gridline ‘3.3’ · The windows ‘marked’ elsewhere as ‘W1’ at gridline ‘4.65’ · The windows ‘marked’ elsewhere as ‘W1’ at gridline ‘6.1’ · The windows ‘marked’ elsewhere as ‘W1’ at gridline ‘8.4’ · They do not appear to meet the mechanical exhaust termination location requirements per International Mechanical Code (IMC) 501.3.1. Page 2 of 3 On sheet A203 – Exterior Elevations: 8.Detail 1 – West Elevation – Clarify on the plans the representation of the following mechanical exhaust termination locations: The ‘Level 4’ termination at gridline ‘I’ · The ‘Level 4’ termination at gridline ‘J.4’ · On sheet S001 – Structural General Notes: 9.Soils and Foundations – Geotechnical Report – Add to the plans on the list of reports and supplements used for the design of the structure the ‘Design Memorandum’ prepared by Terra Associates dated ‘6-16-16’ regarding the ‘Geofoam Block Backfill’. On sheet S114A – Level 4 Plan: West: 10.Level 4 Post Tensioning Framing Plan – West - Clarify on the plans the indicated longitudinal ‘tendon drape’ at gridline ‘E.5-8’. It does not appear to correspond to that specified on sheet ‘PT-31/PT-32’ of the provided structural calculations. On sheet 116A – Level 5 Plan: West: 11.Level 5 Stud and Shear Wall Plan – West – Clarify on the plans the callout for the ‘bundled stud’ detail on sheet ‘S114B’. There does not appear to be a sheet ‘S114B’, or an applicable detail elsewhere, among the submitted construction documents. Page 3 of 3