20150915094114.pdff'�C. 1$913 CITY OF EDMONDS DAVE EARLING MAYOR 121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • fax (425) 771-0221 www,edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT September 15, 2015 Mr. Leroy Saunders PO Box 4067 Everett, WA 98204 SUBJECT: New SFR at 15911 74th Place W, Edmonds BLD2014-0317 Dear Mr. Saunders: The Earth Subsidence Landslide Hazard provisions of the Edmonds Community Development Code Chapter 19.10 limits land development to the drier season of the year between May 1St and September 30th. All groundwork, including grading and drainage installation must be completed by September 306h and the site be winterized. If work of this nature is not complete and will overlap into the month of October or beyond, the City requires a letter stamped and signed from your geotechnical engineer of record confirming that the site is stable and work may continue past the ordinance deadline of September 30th. If such an extension is requested it must include a detailed schedule of work that establishes a completion date. If the City does not receive such notice from your Geotechnical Engineer of record it is understood that groundwork, as defined by ordinance, shall be stayed until May 1St, 2016. Regardless of whether work commences or is stayed until May 1 st, 2016, the geotechnical engineer of record does need to make winterization recommendations in a field report and provide a copy to the City for approval. Winterization measures typically include protection of exposed slopes with visqueen or hydro seeding, installation and maintenance of temporary erosion control measures and other site stabilization work. Weekly monitoring reports from the geotechnical engineer or designated erosion sedimentation control supervisor are still required to be submitted to the City inspector upon request. It is possible to start groundwork prior to May 1St, 2016 provided an evaluation by the geotechnical engineer confirms the site conditions are stable and work may start without creating erosion or stability problems. This would need to be submitted for approval prior to re -commencing work. If you have any questions please feel free to contact me at 425-771-0220 extension 1380 during City business hours. Sincerely, Leif Bj rbac ;CBO Building Official Incorporated August 11, 1890 Sister City - Hekinan, Japan