Loading...
20150916102654.pdfRandall J. Munson Building Designer 17713 151h Avenue NE— Suite 102 Shoreline, Washington 98155 (206) 349-4551 August 26, 2015 Chuck Miller, Plans Examiner City of Edmonds Building Division 121 5th Avenue North Edmonds, Washington 98020 Re: Plan Check: BLD2015-0831 Project: Shepard Addition/Garage Address: 10222 244th Street SW The following is an item by item response to your correction letter dated August 12, 2015 Sheet A-1 Site Plan, Legend & Index of Drawings 1. A. Plan corrected. B. Plan corrected. C. Plan corrected. D. Plan corrected. Sheet A-2 Exterior Elevations, Building Section, Door and Window Legend 3. New Window identified. 4. Corrected dimension, still works. Sheet A-3 Lower Level Floor Plan & Key Notes 5. Plan corrected. 6, Plan corrected. Sheet A-4 Upper Level Floor Plan & Key Notes 7, A. Plan corrected.. B. Plan corrected. C. Plan corrected. D. Plan corrected. Page Two Re: Plan Check: BLD2015-00831 Project: Shepard Addition/Garage Address: 10222 244th Street SW Sheet A-4 Upper Level Floor Plan & Key Notes Continued 8. A. Plan corrected B. Plan corrected Sheet A-5 Foundation Plan and Details 9. Plan Corrected. Sheet A-6 Framing Plans, Braced Wall Schedule, Details and Notes 10. A. Plan Corrected. B. Plan Corrected. 11, A. Plan Corrected. B. Plan Corrected. C. Replaced Detail #4 with Portal Frame Design. 12. A. Added Detail #7, Sheet a-7 B. Plan Corrected. C. See response 12-A D. New Column Calculation and changed Framing Plan, E. Plan Corrected. Sheet A-9 Design Load and General Notes 13. A. Plan Corrected. B. Plan Corrected. C. Plan Corrected. D. Plan Corrected. Please feel free to contact me directly at (206) 349.4551 if you have any additional concerns. Respectfully