20150924150501.pdf' O� 0 0
City of Edmonds
Traffic Impact Analysis Worksheet
Name of Proposed Project:
Owner/Applicant
e i �e1 �t ! sh
,7'4
AC
Name
56,3 /U Z c��d
Street/Mailing Address
City State Zip
Telephone: 2 -UC, S �F6 3 1
Applicant Contact Person: DEVE C1p1y KArF O ��
RI -1 Ii -tri/c'-lc- 0Y1
Name
5-0 3 /U Z-0 .3 r-4, C %-
Street/Mailing Address
S'h ®n.,-- //A-(
City State Zip
Telephone: 20 CO
h4tr; / -1"���°ih2 yn�c�/lvigQSLi o�r�%9f�r�,ne
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Contact Name
1. PROJECT DESCRIPTION
a. Location - Street address: 765:7- / l0'64tle, /`v -e- FSP2�
(Attach a vicinity reap and site plan.)
b. Specify existing land use: S� ���i y C� -It j,—
c. Specify proposed type and size of development: w
(# of residential units and/or square footage of building)
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page I of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in ECDC 18.82.130.
CHANGE IN USE
Fft;far prior use shall be based on fee established at the time the prior use was permitted. If the
previa ti"s,, se was permitted prior to the adoption of Ordinari'pe'3 16 (effective date: 09/12/04),
the 2004 FCC 18.82.120 impact fee shall be used.
"`� Units in
Pet Onit square feet
ITE nr�'f,(ise Category Fee
1°ee Rate # of dwelling,
vfa, etc.
New Use 13Z $
�ol i ° 3 X �d
��
.........................
G
Prior Use �Zc1rcf 6 X �� _ $ ��+3
New Use,,F6d: $ � Z 19 alp
❑ NEW DEVELOPMENT
New Use
F1 OTHER
qi
-. Prior Use Fie �.o$ � �¢ 5" 3 $
ITE Land Use Category
Per Unit
Fee Rate
X
1114) '" i 0'i,ke ,
Units in
square feet, Fee
# of dwelling,
vfn. etc.
MITIGATION FEE RF,COMMF,NDATION:
S
INDEPENDENT FEE CALCULATION: $200.00 (+ consultant feel
TOTAL TRAFFIC IMPACT FEE
$
,
monds, Engineering Division Approval
Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5