Loading...
20150924150501.pdf' O� 0 0 City of Edmonds Traffic Impact Analysis Worksheet Name of Proposed Project: Owner/Applicant e i �e1 �t ! sh ,7'4 AC Name 56,3 /U Z c��d Street/Mailing Address City State Zip Telephone: 2 -UC, S �F6 3 1 Applicant Contact Person: DEVE C1p1y KArF O �� RI -1 Ii -tri/c'-lc- 0Y1 Name 5-0 3 /U Z-0 .3 r-4, C %- Street/Mailing Address S'h ®n.,-- //A-( City State Zip Telephone: 20 CO h4tr; / -1"���°ih2 yn�c�/lvigQSLi o�r�%9f�r�,ne Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name 1. PROJECT DESCRIPTION a. Location - Street address: 765:7- / l0'64tle, /`v -e- FSP2� (Attach a vicinity reap and site plan.) b. Specify existing land use: S� ���i y C� -It j,— c. Specify proposed type and size of development: w (# of residential units and/or square footage of building) Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page I of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fft;far prior use shall be based on fee established at the time the prior use was permitted. If the previa ti"s,, se was permitted prior to the adoption of Ordinari'pe'3 16 (effective date: 09/12/04), the 2004 FCC 18.82.120 impact fee shall be used. "`� Units in Pet Onit square feet ITE nr�'f,(ise Category Fee 1°ee Rate # of dwelling, vfa, etc. New Use 13Z $ �ol i ° 3 X �d �� ......................... G Prior Use �Zc1rcf 6 X �� _ $ ��+3 New Use,,F6d: $ � Z 19 alp ❑ NEW DEVELOPMENT New Use F1 OTHER qi -. Prior Use Fie �.o$ � �¢ 5" 3 $ ITE Land Use Category Per Unit Fee Rate X 1114) '" i 0'i,ke , Units in square feet, Fee # of dwelling, vfn. etc. MITIGATION FEE RF,COMMF,NDATION: S INDEPENDENT FEE CALCULATION: $200.00 (+ consultant feel TOTAL TRAFFIC IMPACT FEE $ , monds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5