Please find our responses below to your fire review.
Fire Review Comments
Comment #1
a Changes have been made and bubbles
-fi r4z-
OF EDMOND,
Comment #2
0 Corridors outside of project suite (surrounding project suite) are rated because they are B -occupancy
corridors that serve occupant loads greater than 30 in an unsprinklered building — they serve multiple suites
with multiple tenants. The corridors within the project suite simply allow exit access — serving no more than
17 occupants due to paths of egress travel (see revised Life Safety Plan A0.21 indicating the maximum
number of occupants that would be directed to exit through any corridor).
Comment #3
The two corridors within suite 240 have been labeled CORRIDOR on the Life Safety Plan A0.21.
Comment #4
• Changes have been made and bubbled
Comment #5
• Changes have been made and bubbled.
Comment #6
• Sheet A0.21 indicates 4 fire extinguishers approximately equally spaced throughout the project. The legend
now identifies these as 2A:10B:C type. The floor plan has been updated to also indicate these.
Comment #7
Changes have been made and bubbled.
Comment #8
• Changes have been made and bubbled.
Comment #9
• North and west walls of room 224 have been revised to have 1 -hr fire rating.
�II�� /1 257778 747809 Edmond6stWA 98026uite 210 www gba chitects comin the e of Washington
f 4,�JJ�j
� ..6 " ��
a"' r m,�� m 3
Comment #10
Doors 200, 201A, and 203A have been reversed to swing in the direction of exit. Note that doors 201A and
203A serve only 17 and 6 occupants respectively, but that changing the swing is easily accomplished. Note
also that the occupant load has been recalculated at 63, but that this recalculation is not used to benefit any
aspect of exiting — the reduction of 7 occupants has not changed any of our calculations or responses
Comment #11
• See Electrical comments attached
Comment #12
• See Electrical comments attached
Sincerely,
Jeanelle Owens
fiIn's
f
�� t 425 778,1530 21911 76th Ave W, Suite 210 f Incorporated in the State of Washington
�� ,� f 425 774,7803 Edmonds WA 98026 www,tgbarchitects,com Via"
4 Stantec Memo
To: Jeanelle Owens From: Joseph Godwin
TGB Architects Stantec - Lynnwood Office
File: Permit Fire Marshall Review Date: September 21, 2015
Comments
Project Number: B19192
Reference: BLDG2015-0949 SMG Urgent Care 21600 Highway 99 #240
Jeanelle,
I spoke to John Westfall Fire Marshall regarding Comment # 11 and Comment # 12. Comment # 11,
we have revised the Legend to provide clarity on the emergency lighting battery ballast. Comment
# 12 we only have to show the emergency lighting within clinic renovation area and do not have to
show the emergency egress lighting outside of the client renovation space.
Comment #11: Sheet E2.02 Callout Legend identifying fixtures are provided with emergency
pathway function throughout Assembly and Corridors.
Response: Fixture Callout revised to < XXE > to include "E" designation which denotes that fixtures as
an integral battery back-up as descripted within the Lighting Fixture Schedule. We have revised
electrical sheet E1.00 Legend and Abbreviations to reflect the "E" designation Fixture Callout.
Comment #12. Sheet E2.03 See Fire Alarm plans for approved fire alarm system details and location.
Response: Concur, Specification Section 283111 Fire Alarm 1.06 D requires approved shop drawings.
If you should have any questions or comments, please respond.
Thanks
STANTEC CONSULTING SERVICES INC.
Joseph Godwin
Project Manager, Electrical
Phone: (206) 224-3631
Fax:
Joseph.Godwin@stantec.com
Attachment: E1.00 Legend and Abbreviations
C.
Design with community in mind
gj v:\2048\active\204819192\design\corresp\permit-fire marshall review comment.docx