2015-0949 Kruger Clinic.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: September 17, 2015
TO: Jeanelle Owens
TGB Architects
Email: jowens@tgbarchitects.com
FROM: Leif Bjorback, Building Official
RE: Plan Check: BLD2015-0949
Project: Kruger Clinic-SMG Urgent Care
Project Address: 21600 Highway 99 #240
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can be found
on the plans, and submit revised plans/documents to a permit coordinator in the Development Services
Department. Thank you.
Sheet A0.41 and M0.03
1.Penetrations through the 1 hour rated ceilings must be protected according to IBC 714.4. Show on the
plans how the penetrations by ducts and exhaust fans are to be protected.
Sheet A2.11
2.Doors serving an occupant load of 50 or more must swing in the direction of egress. Please reverse
the swing of doors 200, 201A and 203A. IBC 1008.1.2
3.Soiled Work Room 204 appears to exceed 100 square feet, and must be protected by 1 hour
assemblies. IBC Table 509
Structural
4.In the Forte structural calcs, floor beams at line 2-span 1 and line 6-span 2 are noted Add
channels to strengthen beam, however, the channels are not shown on sheet S2.11. Please revise the
plans as needed.
5.Please provide calcs for the C-channels at floor beams located at line 4-span 4 and line 4-span 5.