Loading...
2015-0996 Burlington Coat Factory mechanical - Heattransfer.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: August 25, 2015 TO: Heattransfer Co. Richard Sinnema heattransfer1@aol.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-0996 Project: Burlington Coat Factory mechanical Project Address: 24111 Highway 99 During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Review Note: 1.Provide on the plans a detail, designed and ‘stamped’ by an engineer, for the required support and attachment of rooftop units ‘RTU-1’ and ‘RTU-2’ per IMC 301.15/18, IBC 1609/1613, and ASCE 7-10 chapter 13. The provided structural calculations appear to be a design for rooftop mechanical replacement work done under permit BLD2014-0743. Unfortunately, the proposed units to be replaced under this permit appear to be heavier and larger than those replaced under permit BLD2014-0743, and beyond the design criteria of the provided structural calculations.