20151005084623.pdfr-bnGE&
1 4 C 0 K P 0 0 A T 1 0
Geotechnical & Earthquake
Engineering Consultants
April 27, 2014
File No. 13-063-100
Mr. Nicholas Echelbarger
Salish Landing LLC
PO BOX 1088
Edmonds, WA 98020
Re: Salish Pavilion — BLD2015-0294
150 Sunset Ave S
Edmonds, WA
Dear Mr. Echelbarger,
This letter presents geotechnical recommendations for the design of the foundations for
the Salish Pavilion located at 150 Sunset Avenue South in Edmonds (see Figure 1). The
building site is located at the southwest corner of the intersection of James Street and
Sunset Avenue South, as shown on Figure 2. The Pavilion Building will be constructed
at the northeast corner of the Salish Crossing shopping center in an area that has been
used for parking and drive lanes.
SITE CONDITIONS
The shopping center was reportedly built in 1966 and the buildings were supported on
piles with lengths on the order of 10 to 23 feet. Soils underlying the site of the shopping
center include highly compressible peat that has contributed to as much as 3 feet of
differential settlement between 1966 and 1980 when 3 geotechnical borings were
advanced at the site to provide recommendations for building improvements. The
locations of these borings, B-1-80 thru B-3-80, are shown on Figure 2 along with our
estimates of the depth to the top of the soil bearing stratum within which the piles were
tipped. Additional borings were drilled at the site in 1991 in conjunction with other
improvements at the shopping center. The locations of these borings are also shown on
Figure 2 as Borings B-1-91 thru B-3-91 and logs of all borings are presented in Figures 3
thru 7.
As indicated in Figure 2, the very dense sands and gravels of the bearing stratum dip
down to the east. As such the bearing stratum may underlie the Pavilion Building at a
depth of about 20 feet. The soils overlying the bearing stratum include surficial gravel
3213 Eastlake Avenue East Suite B
Seattle, WA 98102-7127
T (206) 262-0370
F (206) 262-0374
Page 2 of 5
April 27, 2015
Salish Pavilion
fill overlying soft compressible peat with interbedded layers of loose sand. Groundwater
may be present at a depth of about 9 feet.
SEISMIC DESIGN PARAMETERS
The following provides seismic design parameters for the site that are in conformance
with the 2012 International Building Code (IBC), which specifies a design earthquake
having a 2% probability of occurrence in 50 years (return interval of 2,475 years), and the
2008 USGS seismic hazard maps:
Design
Spectral
Spectral
S
Site
Spectral
Control
Site
Acceleration
Acceleration
Coefficients
Response
periods
Class
at 0.2 sec. (g)
at 1.0 sec. (g)
Parameters
(sec.)
Ss
S,
Fa Fv
SDS SDI
To Ts
10.59
D
1.27
0.50
1.0 1.5
70.85 0.50
0.12
Although the site is underlain by very soft compressible peat and potentially liquefiable
soils, we believe that a Site Class D conservatively bounds the expected site response
under seismic conditions.
There are no known faults within 5 km from the site. The nearest inferred fault is a
strand of the South Whidbey Island Fault that has been inferred from geophysical surveys
in the Puget Sound but fault traces have not been mapped on the mainland.
Consequently, special designs for fault displacement are not required.
The potential for earthquake -induced soil liquefaction in the loose to medium dense sand
layers within the compressible peat is considered to be moderate. Consequently, pile
foundations are recommended for the new building to mitigate potential settlement of the
underlying soils associated with static and dynamic loading.
PIN PILE FOUNDATIONS
We recommend that the new Pavilion Building shell and floor slabs as well as the floor
slab of the associated outdoor terraces be supported on 4 inch diameter pipe piles driven
to refusal into the dense to very dense sands underlying the site at a depth of about 20 feet
to avoid excessing long term settlements of the peat and potential liquefaction of sand
layers within the peat. However, since the parking areas adjacent to the building will not
be mitigated to preclude liquefaction and future settlement, utilities within the parking lot
may experience distress at or near their entry of the pile supported building, which may
result in breaks of water service and sewer lines.
Detailed design recommendations are presented below.
13-063-100 Salish Pavilion.docx PanGEO, Inc.
Page 3 of 5
April 27, 2015
Salish Pavilion
Pile Capacity - The number of piles required depends on the magnitude of the design
load. An allowable axial compression capacity of 10 tons may be used for 4-inch
diameter piles with an approximate factor of safety of 2.0. Penetration resistance
required to achieve the capacities will be determined based on the hammer used to install
the pile. Tensile capacity of pin piles should be ignored in design calculations.
It is our experience that the driven pipe pile foundations should provide adequate support
with total settlements on the order of/z-inch or less.
Pin Pile Specifications - We recommend that the following specifications be included on
the foundation plan:
1. 4-inch diameter piles should consist of galvanized Schedule-40, ASTM A-53
Grade "A" pipe.
2. 4-inch piles shall be driven to refusal with a minimum 850-lb hydraulic hammer.
The driving criteria will be determined based on the actual hammer size selected
by the contractor, and a static load test program (see discussion in Item 4).
3. To avoid piles "running" or driven to excessive depths into the bearing stratum,
we recommend that all piles be driven with a closed end.
4. At least 3% (but no more than 5) of the 4-inch pin piles should be load tested. All
load tests shall be performed in accordance with the procedure outlined in ASTM
D1143. The maximum test load shall be 2 times the design load. The objective
of the testing program is to verify the adequacy of the driving criteria, and the
efficiency of the hammer used for the project
5. Piles shall be driven in nominal sections and connected with compression fitted
sleeve couplers (see detail below — Courtesy of McDowell Pile King, Kent, WA).
We discourage welding of pipe joints, particularly when galvanized pipe is used,
as we have frequently observed welds broken during driving.
POD
2" Po 6"
N
Now ;!R ool 6nqpaw 9:nwa¢;P on
fl GA" Rw 9q�" 1 )X' to 2'wide X SProng ! ua aal Ring
0/4Pllowg ww;Ie9 rp W pope wu4evve
D nven Swel Pqm Secdfan
Beveled Q,Iiid po aid 11nsel'Blftl"Y
6. As required for this type of construction, the geotechnical engineer of record or
his/her representative shall provide full time observation of pile installation and
testing.
13-063-100 Salish Pavilion.docx PanGEO, Inc.
Page 4 of 5
April 27, 2015
Salish Pavilion
The quality of a pin pile foundation is dependent, in part, on the experience and
professionalism of the installation company. We recommend that a contractor with
experienced personnel be selected to install the piles.
Lateral Forces - Lateral capacity of vertical pin piles should be ignored in design
calculations. Some resistance to lateral loads may be accomplished by battering the piles
to a slope no steeper than 3(H):12(V). Additionally, lateral forces may be resisted by
passive pressures acting on the grade beams and pile caps. Passive resistance may be
determined using an equivalent fluid weight of 500 pcf, assuming that the pile caps are
backfilled with compacted City of Seattle Type 17 soil.
Grade BeanvPile Cap Embedment - We recommend that the grade beams and pile caps
located around the perimeter of the structure be embedded such that the bottom of the
grade beam is at least 12 inches below the adjacent ground surface.
Estimated Pile Length - The required pile length to develop the recommended pile
capacity may vary depending on the actual subsurface and driving conditions
encountered. For planning and cost estimating purposes, we estimate that an average pile
length of about 30 feet will be needed.
Obstructions - Obstructions may be encountered during pile driving. Where possible, the
obstructions should be removed to facilitate the pile driving. If obstructions cannot be
removed, the structural engineer of record should be notified to revise the pile layout to
accommodate the adjustment.
Geotechnical Observation — In accordance with the International Building Code,
PanGEO will need to be present on a full time basis during driving of all piles and the
load testing of selected piles to confirm the driving criteria used for the installations and
also to confirm that all driven piles meet the requirements of the structural drawings.
LIMITATIONS
We prepared this report for Salish Landing LLC and the project design team.
Recommendations contained in this report are based on a site reconnaissance, a review of
pertinent subsurface information, and our understanding of the project. The study was
performed using a mutually agreed -upon scope of work.
Variations in soil conditions may exist between the locations of the explorations and the
actual conditions underlying the site. The nature and extent of soil variations may not be
evident until construction occurs. If any soil conditions are encountered at the site that
are significantly different from those described in this report, we should be notified
immediately to review the applicability of our recommendations. Additionally, we
should also be notified to review the applicability of our recommendations if there are
any changes in the project scope.
The scope of our work does not include services related to construction safety
precautions. Our recommendations are not intended to direct the contractors' methods,
techniques, sequences or procedures, except as specifically described in our report for
consideration in design. Additionally, the scope of our work specifically excludes the
13-063-100 Salish Pavilion.doex PanGEO, Inc.
Page 5 of 5
April 27, 2015
Salish Pavilion
assessment of environmental characteristics, particularly those involving hazardous
substances. We are not mold consultants nor are our recommendations to be interpreted
as being preventative of mold development. A mold specialist should be consulted for all
mold -related issues.
This report has been prepared for planning and design purposes for specific application to
the proposed project in accordance with the generally accepted standards of local practice
at the time this report was written. No warranty, express or implied, is made.
This report may be used only by the client and for the purposes stated, within a
reasonable time from its issuance. Land use, site conditions (both off and on -site), or
other factors including advances in our understanding of applied science, may change
over time and could materially affect our findings. Therefore, this report should not be
relied upon after 24 months from its issuance. PanGEO should be notified if the project
is delayed by more than 24 months from the date of this report so that we may review the
applicability of our conclusions considering the time lapse.
It is the client's responsibility to see that all parties to this project, including the designer,
contractor, subcontractors, etc., are made aware of this report in its entirety. The use of
information contained in this report for bidding purposes should be done at the
contractor's option and risk. Any party other than the client who wishes to use this report
shall notify PanGEO of such intended use and for permission to copy this report. Based
on the intended use of the report, PanGEO may require that additional work be performed
and that an updated report be reissued. Noncompliance with any of these requirements
will release PanGEO from any liability resulting from the use this report.
Please call if there are any questions on this letter.
Sincerely,
W. Paul Grant, P.E.
Principal Geotechnical Engineer
Attachments: Figure 1
— Vicinity Map
Figure 2
— Site Exploration Plan
Figure 3
— Log of Test Boring B-1-80
Figure 4 - Log of Test Boring B-2-80
Figure 5
— Log of Test Boring B-8-80
Figure 6
— Log of Test Borings B-1-91 and B-2-91
Figure 7
— Log of Test Boring B-3-91
13-063-100 Salish Pavilion..docx PanGEO, Inc.
Salish Pavilion VICINITY MAP
PanGE& 150 Sunset Ave S
M c o o p o stj% ,r a o Edmonds, Washington
No. 13-063-100 1
Figure No..
1
W
„fJ e r t J
,r" �0 ••. -u✓1M .�.k A.N Stl" �'� JA a r, dU:A '" aru JadS Mw.. ,GdW a m^^
r-bnGEED Salish Pavilion
150 Sunset Ave S
I OW C 0 It . 0 R A , 8 0 Edmonds, Washington
SITE EXPLORATION PLAN
STANDARD
5
10
15
20
25
35
SOIL DESCRIPTION
2" Asphalt
Medium dense to loose, saturated, gray,
slightly silty, medium to coarse sand
(Fill?)
Interbedded, very soft, brown peat and
loose, saturated, gray, silty, fine to
medium sand
Dense to very dense, saturated, gray -brown,
silty sand and gravel
Boring complete at 31.5 feet
June 25, 1930
LEGEND
2.0" C.D. eplit s2mp'er * _97arrple rot recovered
U 3.0" O.D. undis'.--rbe4d ,a:r;1er i Piezc;rnater tip
P E2-ipler pushed SZ 'Arzter level
Atterberg Units: LiqWd limll
IlVaral waler content
Plzu;lc Limit
I
PENETRATION RESISTANCE
A Blows per Not
(140 lb. hammer, 30" drop)
10 20 30 40 5b
P
7\_
4
3 'yv :Water C ca I,- r t
Edtionds Shopping Center
LOG OF BORVIG JNO '
W-3355 B-1 -80
RITTEN110TJSE-Z)"1!jMA1Fig. 3., -1.
W STANDARD
< P•ENMATION RESISTANCE
SOIL DESCRIPTION a z ,A glows per toot
0. (140 lb. hammer, 70" drop)
a Surface Elevation: � u 10 20 30 40 Alt
2" Asphalt
�^ Loose brown sand (Fill)
Medium dense saturated re slightly...•.
l9ed grey,
5 silty medium to coarse sand (Fill?)
Interbedded, very soft brown peat and loos
10 saturated, grey silty fine to medium sand
P.
15
,
Dense, saturated, grey -brown, 'silty sand
20
and gravel
25 Boring complete at 24:0 feet - --------- -----
W
I,EG E. ND
T 2.01, O.D. eylSt z; : rampler • Sample .1-A reccscred
.2 9.0" O.D. &irpler ( Pit•torieter lip
P 2"am;l:r puhhed `7 v4altr level
Alterterg limas: Llgt4id lictlt
"e ti Natural aster convent
Plastc Urnit
June 20', 19330
cd,nonds Slopping Center
'.� OF BORING h0. R-2 -80
W- = 355
RITTEN'HOUSE-7ENIAN Rg. 4.
"{)n.s ENGIN"EM3.1:;G ?.: D GEC
tr w STANDARD
m F-
PENETRATION RESISTANCE
w SOLE DESCRIPTION to
A Mows per loot
M O (140 lb. hammer, 30" drop)
a Surface Elevation: 0 10 20 30 40
5" Asphalt
Loose, saturated,
mreo csalty sand
grey, l
d (Fill?)
Interbedded very �..W4..�. .�
5 y brown peat, loose
to medium dense, saturated grey, fine to
medium sand —�
:P
Dense, saturated, grey -brown, silty sand —
and gravel's -
25 Boring complete at 24.0 feet - °w -
35
.40
I.EEGF N D
I 2.0" O.D, rsp`.it scLa t.arnp'er • Sp.rr•p,p nil rect'-verca
3.0"O.D. ur."_is:•,.rbed sa:-picr Piezorrseter tip
P F.:n:;'c•r pus'led !Z water level
A'.'e:t.:;,'i,...._. I .� - j}— L!gtsid llrnit
PlaS:)c Limit
June 25, 1980
r2 ": Walcr Canter.t
I:d:,londs shopping center
LOG OF ROi?::;G ;:0. B-3 -80
�Z 3 E cl.•..�PJxc AND c�c:.
Boring 1 .-91
Elevation 15 Feet
Sod
Classification
Sample
Blows
Depth
System
Symbol ,,
Descriptlon
Interval
(feat)
per
Fooea)
--
r asphalt
0.1-7.5
SM/GM
Medium brown and gray,,, fine to coarse SAND with
-"
2.5,,4.0
23'
gravel and silt,„ and fine to coarse GRAVEL with
sand and sift (medium dense, moist) OR
7.5-10.0
ME/Oil
Dark brown to medium gray -brown SILT with
7.5-9.0
1 for 18•
organics and reeds. and organic SILT (very soft,
'
moist)
10.0.17.5
SP
Gray, medium to coarse SAND with gravel
12.5-14.0
38
(medium dense to dense; wet)
17.5-19.6
GP
Gray, fing to coarse GRAVEL with sand (dense to
17.5-19.0
52
very dense, wet)
Boring completed to 19.0 ft on 7116/91.
Groundwatir encountered
at time of drilling at 9.0 ft.
Boring 2 ® 1
Approximate Elevation 15 Feet
SOU .
J
Clasadicatbn
Sample
Blows
Depth
System
Interval
per
(feet).
Symbol
Description
(feet)
Foot(a)
--
2• asphalt
0.1-4.5
SWGM
Medium brown to gray, silty fine to coarse SAND
2.5-4.0
12
with gravel and silty fine to coarse GRAVEL with
sand (medium dense. moist to wet) (fill)
4.5-8.5
OUPT
Dark brown to brown -black, organic SILT and
7.5-9.0
3
PEAT (very soft, moist)
8.5-14.0
MUOL
Dark brown SILT with organics interlayered with
12.5-14.0
1 for 180
thin layers of gray, fine to coarse sand; sandier
towards base, gradational contact (very soft, moist)
14.0-18.5
SP
Gray, medium to coarse SAND with gravel and
17.5-19.0
21
trace silt (medium dense, wet)
18.5-22.5
SM
Gray., silty, fine SAND with gravel (medium dense,
21.0-22.5
40
to dense, moist) (till)-
Borin g completed to 22.5 4 on 7115/91.
Groundwater enbountered at time of drilling at 14.0 ft.
(a) Blows required to drive 2.04nch 00 split -barrel sample i foot with a hammer weight of 140' pounds and
a stroke of 30 Inches.
LANDAU ASSOCIATES, INC. Loq of Borings
Boring 3 1
Approximate Elevation 15 Feet
classification
Samplir
Blows
Depth
System "
Interval
per
(feet)
Symbol
Descrption
(feet)
FootIa)
..
34.asphalt
0.2-4.5
SM/GM
Medium brown to gray, sihy, fine to coarse SAND
with gravel and silly fine to coarse GRAVEL with
sand (loose; moist to wet) (flp)
4.5-9.5
MIJOL
Medium 'brown and dark brown SILT with organics,
7.5-9.0
3
twigs and reads, and organic SILT (very soft to
soft, moist)
.9.5-22.0
SW/GW
Dark gray, fine to coarse SAND with gravel and
12.5-14.0
87
sandy fine to coarse GRAVEL with trace sift (dense
17.5-19.0
50 for 5.5"
to very dense, wet)
22.0-23.0
SP/SM
Gray, medium to coarse SAND with gravel grading
22.5-23.5
50 for 5"
to gray, (ins to medlUrn SAND with silt and gravel
(very, dense; moist) (till)
Test pit completed to 23.0 ft on 711Big 1.
Groundwater encountered at time of drilling at 9.5 it,
(a) Blows required to drive 2.0-Inch OD split -barrel sample 1 foot with a hammer weight of 140 pounds and a
stroke of 30 inches.
LANDAU ASSOCIATES, INC. Loy of Borings