Loading...
2015-1010 Triece addition-remodel2 - Sandall Norrie Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 2, 2015 TO: Peter Sandall pete@sandallnorrie.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1010 Project: Triece addition-remodel th Project Address: 19405 89 Place W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet F1: 1.Framing Plan a.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over the door openings in the south wall of the ‘Dining Room’. It appears to be over spanned and fails in bending. There does not appear to have been any beam calculations submitted in support of the specified structural members. b.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over the window ‘marked’ ‘5’ in the south wall of the ‘Kitchen’. It appears to be over spanned and fails in bending.