Loading...
2015-1010 Triece addition-remodel3 - Sandall Norrie Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 12, 2015 TO: Peter Sandall pete@sandallnorrie.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1010 Project: Triece addition-remodel th Project Address: 19405 89 Place W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Items that recur appear in italics. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet F1: 1.Framing Plan a.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over the door openings in the south wall of the ‘Dining Room’. It appears to be over spanned and fails in bending. The beam calculations submitted in response to the plan review comment does not account for the cantilevered portion of the upper floor framing, the dead load from the exterior wall, and the increased span of the roof due to the cantilever and its eave. b.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over the window ‘marked’ ‘5’ in the south wall of the ‘Kitchen’. It appears to be over spanned and fails in bending. The beam calculations submitted in response to the plan review comment does not account for the cantilevered portion of the upper floor framing, the dead load from the exterior wall, and the increased span of the roof due to the cantilever and its eave. Page 2 of 2