PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: October 12, 2015
TO: Peter Sandall
pete@sandallnorrie.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-1010
Project: Triece addition-remodel
th
Project Address: 19405 89 Place W
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator. Items that recur appear in italics.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on
Wednesdays.
Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional
comments.
On sheet F1:
1.Framing Plan
a.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over
the door openings in the south wall of the Dining Room. It appears to be over
spanned and fails in bending. The beam calculations submitted in response to the
plan review comment does not account for the cantilevered portion of the upper floor
framing, the dead load from the exterior wall, and the increased span of the roof due
to the cantilever and its eave.
b.Clarify the callout for the optional 3-1/8x9 GLB to be used to support the loads over
the window marked 5 in the south wall of the Kitchen. It appears to be over
spanned and fails in bending. The beam calculations submitted in response to the
plan review comment does not account for the cantilevered portion of the upper floor
framing, the dead load from the exterior wall, and the increased span of the roof due
to the cantilever and its eave.