2015-1012 Select Homes SFR2 - Nash.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: March 23, 2016
TO: Select Homes, Inc.
kayla.clark@outlook.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-1012
th
Project Address: 925 9 Avenue N
Project: Select Homes SFR
Scope: Construct single family residence R-3/U occupancy group V-B
construction - NFPA-13D sprinkler system required mechanical and plumbing
included
disapproved
Please be advised that the building plans for the above referenced project have been
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
.
information, clarifications, or changes are neededReviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the clouded or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
On sheet A3:
1.Foundation Plan Indicate on the plans the minimum required widened footings below
each end of the beam over the 6080 sliding glass door in the west wall of the Bonus Room.
The typical footing appears to be undersized for the loads anticipated by the represented
construction and indicated in the provided beam calculations. The size of the added
widened footings and the load noted at those locations on the resubmitted foundation plan
does not appear to reflect that anticipated by the represented construction. While the load
noted may be that expected below each end of the 6 beams BB-1 5-1/8x9 GLB there
appears to be three of those beams placed end-to-end in the west wall of the Bonus Room.
The cumulative loads below the converging ends of the beams at each side of the 6080
sliding glass door would be approximately twice that noted and require a larger footing than
that added in response to the earlier review comment.