Loading...
20151012141026.pdfBeck & Associates, PLLC Structural Engineering & Code Consulting October 10, 2015 Leif Bjorback Building Official City of Edmonds 1215 th Avenue North Edmonds, WA 98020-3145 Subject: BLD2015-0294 Top Pot—Salish Crossing Pavilion, Structural -only Review Enclosed: Transmittal • (1) set of reviewed drawings (stamped REVIEWED structural drawings) and submitted documents Our structural -only review of the permit application materials & drawings is now complete. The following items should be noted as Conditions of Permit Approval: • The following items are required to be submitted as Deferred Submittals to this permit: o Steel Stairs/Prefabricated Stairs (reference 52.2) o Glazing system and connection to main building The Elctr of Record EOR shall be responsible for reviewing design drawings and calculations for compliance with the design criteria and compatibility with the design of the primary structure, including review of all connections to the primary structure. The EOR shall review the submittal prior to providing it to the City for review. The submitted documents shall bear the shop drawing stamp of the EOR. The specialty Structural Err ineer SSE shall provide drawings and calculations for the deferred design submittal to the EOR for review. Design shall conform to loading & deflection criteria as required by the 2012 IBC. Drawings and calculations for deferred submittals shall be designed by a structural/civil engineer licensed in the state of Washington. Deferred submittals shall be stamped/signed by the SSE and shall include all material requirements and manufacturer literature. • Special inspections are required on this project as specified within the structural drawings: concrete, reinforcing steel, and steel fabrication & erection, post -installed anchors. Reference the Structural General Notes. • Geotechnical inspections are required as recommended by the geotechnical engineer for the installation of deep foundation elements (piles), excavation, soil conditions, fill placement, density, drainage, etc. PanGEO is required to be present on a full time basis during the driving of all piles and the load testing of selected piles to confirm the driving criteria used for the installations and also to confirm that all driven piles meet the requirements of the structural drawings (p. 4). Please contact me at should you have any questions. Thank you. Douglas Beck, PE, SE Beck & Associates, PLLC 16425 SE 66`h Street, Bellevue, WA 98006 ® beckpllc@msn.com d PH: 206-313-3739