October 28, 2015
File No. 242014.013
Ms. Jen Machuga
Public Works Department, Planning Division" �
City of Edmonds UE;F1A RAEN1
121 Fifth Avenue North 01"TY OF` EDNI AID
Edmonds, WA 98020
References: Port of Edmonds New Restroom Plan Review Corrections
Plan Check #: BLD20151165
Project: Port of Edmonds, Edmonds Marina Restrooms
Dear Ms Machuga:
We received your comment letter dated October 27, 2015, for the referenced project.
Your review comments (in italics) and our corresponding responses are shown below.
Revisions complying with your comments have been incorporated into the construction
plan sheets.
Buildiniz Exterior
Please indicate whether any changes are proposed to the building exterior
materials and colors that were reviewed and approved as part of the associated
design review application (PLN20140071) for both the Taos and Cheyenne
restrooms. See attached color elevation views for reference. If any changes are
proposed, please provide a revised color elevation view indicating all proposed
changes.
No changes are proposed for the building exterior materials and colors.
Setbacks
2. The Commercial Waterfront (CW) zone requires that buildings be set back a
minimum of 15 feet landward of the bulkhead. According to information
submitted during the associated shoreline permit and design review applications
(PLN20140070 and 71), they Cheyenne Restroom was stated as being 72 feet -
landward of the bulkhead and the Taos restroom was stated as 25 feet landward
of the bulkhead. Please confirm that there has been no changes to the proximity
of the proposed restrooms to the bulkhead and indicate the minimum 15' setback
from the bulkhead on the site plan.
I++rot VVJ't'i;i(1�l
Ms. Jen Machuga
City of Edmonds, Planning
October 28, 2015
File No. 242014.013
Page 2
The proximity of the proposed restrooms to the bulkhead has not changed. The
minimum 15 -foot setback has been added to the site plan.
Landscaping
3. It was noted on the plans that some existing landscaping will need to be
removed and replaced as part of the project. Please indicate the landscaping
within any existing landscaped areas that may be disturbed during construction
and indicate how that landscaping will be replaced (including size and species
of existing and proposed replacement plants). If any new landscaped areas are
proposed with the project, please also provide landscaping information for
those areas.
Construction Notes 5 and 6 on Sheet C3.0 indicate the existing type and size of
the landscape planting that need to be replaced if removed during the sewer
installation.
If you have any questions or concerns while reviewing the documents, please call me at
(425) 741-3800.
Sincerely,
Reid Middleton, Inc.
Mark Davis, P.E.
Design Engineer
v1j\h:\24wf\2014\013 edmonds restroom\grading permitesponsecitycomments102715—P1amringeomments.docx\mad