Loading...
20151030093707.pdfReidlMiddleton October 28, 2015 File No. 242014.013 Mr. Leif Bjorback Public Works Department, Building Division IJM,'. AV , ffta,Wdv �GI�N� U.,F, City of Edmonds �"'H J 121 Fifth Avenue North Edmonds, WA 98020 References: Port of Edmonds New Restroom Plan Review Corrections Plan Check #: BLD20151165 Project: Port of Edmonds, Edmonds Marina Restrooms Dear Mr Bjorback: We received your comment letter dated October 20, 2015, for the referenced project. Your review comments (in italics) and our corresponding responses are shown below. Revisions complying with your comments have been incorporated into the construction plan sheets. 1. On sheet C3.0 show the van accessible parking stall as 11 feet wide, instead of 10 feet as shown. ICC A117.1 section 502.2 Both accessible stalls have been changed to 11-foot wide van accessible stalls in the plans. The parking stall detail has also been changed. 2. On sheet C3.0 revise the parking stall layout so that the accessible stalls are on the shortest route possible to the entrance of the restroom per IBC 1106.6. The parking stall layout has been revised so that the accessible stalls are on the shortest route to the restroom entrance. The proposed grading of this area has been modified to ensure that the accessible stalls are graded per ADA guidelines for slope. These changes to grade have been made on Sheet C2.0. If you have any questions or concerns while reviewing the documents, please call me at (425) 741-3800. Sincerely, Reid Middleton, Inc. Mark Davis, P.E. Design Engineer v1j\hA24w1\2014\013 edmonds restroom\grading permit\responsecitycomments102715_buildingcomments.docx\mad