Loading...
2015-1091 Albertson addition-remodel3 - Clay Design.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: November 16, 2015 TO: Elizabeth Clay Johnson elizabeth@claydesignllc.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1091 Project: Albertson addition-remodel th Project Address: 19715 80 Place W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Items that recur appear in italics. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet A104 – Framing Plans 1.Roof Framing Plan a.Clarify the callout for the 2-2x12 hip rafters. They appear to be over spanned, fail in bending, and deflect beyond that permitted per IRC Table R301.7. b.Clarify the callout for the proposed 2-2x12 ridge beam. It appears to be over spanned and fails in bending.