Loading...
2015-1109 Rapelje addition-radiant heat - HO.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 17, 2015 TO: Anri Rapelje anri@anrlandscapedesign.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1109 Project: Rapelje addition-radiant heat th Project Address: 22310 98 Avenue W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Review Notes: 1.Indicate on the plans the means to be used to provide the required minimum whole-house mechanical ventilation per International Residential Code (IRC) M1507.3. On sheet 2: 2.Floor Plan Basement: a.Provide a ‘framing plan’ indicating the existing structural members over the ‘Basement Floor’ per the City of Edmonds ‘Residential Addition/Remodel/Alteration Permit Submittal Requirements”. Of particular concern is the span and support of the existing floor joists where openings for a ‘new pocket door’ and a ‘new door’ have been created in the ‘non load-bearing wall’ along the ‘Hallway’. There appears to be a representation of what could be posts on the ‘Storage’ side of the ‘Hallway’ that may be supporting a beam(s) above, but there is no indication on the plans. b.Indicate on the plans the minimum required installation of ‘R-15’ wall insulation for wall cavities exposed during construction per WSEC R101.4.3.