20151120155923.pdfC �
ENGINEERING
MEMORANDUM
civil & structural
engineering & planning
To: TJ Mellema, Exxel Pacific
From: C. Chevy Chase, PE, SE
Date: April 15, 2015
CC: David Wilson, Carletti Architects
Re: Prestige Care
21008 76" Ave W
Edmonds, WA 98026
CG Engineering has performed 3 official site observations of the Prestige Care project. Our objective was to
observe that the framing conditions conformed to the structural plans. The Prestige Care project, to the best
of our knowledge, was constructed in accordance with the project structural drawings and specifications,
including approved field changes. The structural conditions that we observed were satisfactory.
Please let us know if you have any other questions.
Thank You,
Chevy Chase, PE, SE
M, I
9124115
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com
4