Loading...
2015-1168 Gelotte.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: November 2, 2015 TO: Randy Newton rknewt@msn.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-1168 Project: Gelotte Residence rd Project Address: 222420 93 Place W. During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Sheet 1 1.Beam 80a is listed as the beam between the 2-post footing located at Y2, X2. From the engineering calculations, beam 80a is shown to be a 4x10 minimum (‘or add post’). Please verify that the engineer’s intended design has been implemented. Sheet 3 2.Please show smoke detectors within each bedroom and outside of, but in the vicinity of each bedroom group per IRC R314. 3.Show a carbon monoxide detector per IRC R315. 4.Note on the plans that a range hood with a minimum capacity of 100 CFM is required in the kitchen per IRC M1507.4. 5.The window adjacent to the tub within the M. BATH is required to have safety glazing per IRC R308.4. Please revise the plans to note this. 6.Add a note to the plans that the whole-house ventilation (WHV) controls are to be labeled ‘Whole House Ventilation’ per IRC M1507.3.2(4). 7.In addition, note on the plans that with a capacity of 150 CFM (as shown), the WHV is to be installed with a 24-hour timer set to run for (2) hours out of every (4)-hour period per table M1507.3.3(1). 8.It appears that the window within the guest room BATH is required to be safety glazing per IRC R308.4. Please revise the plans to note this. Sheet 4 9.The rafters over the entry are shown as 2x8 rafters in flat use. Please revise the plan or provide calculations and a detail of how this is to be constructed. 10.It appears that the C12x25 steel channel along the north side of the entry is unsupported at the exterior end, or is drawn incorrectly. Please review that beam and revise the plans or provide an explanation of how that is to be framed. Page 2 of 2