During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on
Wednesdays.
On sheet 2:
1.Existing Main Floor Plan - Indicate on the plans the required construction to support the
loads below the north end of the beam used to replace the section of wall in the Kitchen as
indicated on sheet 3. The point load appears to fall beyond the wall of the Hall.
On sheet 6:
2.Existing Deck Foundation/Framing Plan Clarify the callout for the 12x12 footings for the
middle two of the four footings indicated for the north-most deck. They appear to be
undersized per IRC Table R401.4.1.
3.Existing Deck Section Indicate on the plans the required minimum depth of the footing
below the undisturbed ground surface of 12 inches per IRC R403.1.4.