Loading...
2015-1180 Forbes remodel-deck repair2 - Parsons Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 26, 2015 TO: Steve Johnson cjconstrux@msn.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1180 Project: Forbes remodel-deck repair th Project Address: 21403 95 Avenue W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. On sheet 2: 1.Existing Main Floor Plan - Indicate on the plans the required construction to support the loads below the north end of the beam used to replace the section of wall in the ‘Kitchen’ as indicated on sheet ‘3’. The point load appears to fall beyond the wall of the ‘Hall’. On sheet 6: 2.Existing Deck Foundation/Framing Plan – Clarify the callout for the 12x12 footings for the middle two of the four footings indicated for the north-most deck. They appear to be undersized per IRC Table R401.4.1. 3.Existing Deck Section – Indicate on the plans the required minimum depth of the footing below the undisturbed ground surface of 12 inches per IRC R403.1.4.