20151215144824.pdfSPECIAL INSPECTION AND TESTING AGREEMENT
Permit #:
Project:'
Prior to issuance of a permit, this form must be completed in its entirety and returned to the Cityfor
approval. The completed,form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
,5pqJpJ IM. actig1l Fiat and S ec,i I
The Special will rform special
p ialor the following t f es of (separate forms must be submitted if more than � e
inspection F gyp p one firm is to be
employed):
* Reinforced Concrete • Pipe Pile Placement
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City, Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shalt be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
't tt t ttt.ttw
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to (lie normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
1�draa�r-uxcrr�lu crproR54agnhsnU)�xun4ci�[,1am� tiilelPwjrck Hcs12015-1274 Memory Care F'oundalion.dtw10/29001 i
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector sWi be
responsible for approving various stages of construction to be covered and for work to proceed.
iftwo pld"WWW
The architact and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvaLs are
obtained, prior to work shown on the revisions being performed in the field.
Owncr;
-r -re as *e owners avent. shall em♦lov the special inspector or
j-,
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, inay void this agreement and the Building Official's approval of the special inspecto)'.
to such a case a now special Inspector and/or firm would need to be peoposed for approval, A Nilure, of the
design and/or construction parties to perform in accordance with this agreement may rusAilt in STOP WORK
notice being posted an the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this: agy ment.
-j kivelsc*
.A,040
Owner Date
Contractor:
__Sig Date:
Special Insp . . ........ Si tete Date-,
Special Insp. Agency . ....
ACCEPTED F(e)jr-, CITY or, EDMONDS BUILDING DEPT.
By -
LIN
TR
1101111
Vil 111IM111 1101 11 1�
00110114 JI)LU4011WW",
i lw q"ii any revisions argil akhlr-wk- the City inspector will "Milim (tic special
inspection functions for ,,ornpiiance with the agreement azul the approved plans. The City inspector shall be
responsible for approving vatious stages of construction to be covered and for work to proceed
I C Au� IIAL§j,
hie 'irchiwo �tndlixengineer will clearly indicate on lk' flans and qw6fications the �pecific vyl�c, o! iti,d
inspection required and shall include a schedule for insf�,,a,Jon and woit', The arcbj(v�:ii ,%a(Vx enu= c,(
ilt
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Q -WI I � L.
111C project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
J'Oans "Iml flI11,4
wo)Aj nog '^ fo fi'x� biv,
Ow, "Vev'RIIITA rcsuh hn a "il'()V W00,
ACKNOWLEDGMENTS
1 have read and agree to comply with the terms and conditions of this "ga'
)wner-
A, P 1k;i 00"
Contractor -
o
Date:
IX'ac
Special Irutp. Signal Date.
Special lnsp.Agou;y ..... ...... . .
ACCEPTED FOR it CrrY OF EDMONDS BUILDING DEPT,
By:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Vola" Pt°rafegial�
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such 2 way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to he proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
GMENTS �t
have read and agree to comply with the terms and conditions of this agr mens.
d
Jre4k
Owner: ,. .....--signature
� St war,ttut _ _...__ . e ..... �. _ Date: _...
Contractor:. � ....�...� �e� ......_. f; "
g
Arch /I�n �'" �... ,Signature ,��,„ Date:
Special I ns�p..._
Special Insp. A6rcncay. G. ":� ' . �" ,
ACCEPTED FORY'E CITY OF EDMONDS BUILDING DEPT,
By: Date: 1 t t' f r
tledntsvr-usertsluscrpr(lf5\agahanU)ocuments�img FiltAProject FileA201 5-1274 Memory Care Youndation.duclO/2912015
Date: If- C";,l "15 -