Loading...
2015-1252 Schrieber Revison.pdf DATE: October 29, 2018 TO: Scott Schrieber SCOTT.RONSCOTTHOMES@GMAIL.COM FROM: Eric Carter, Building Inspector RE: Plan Check: BLD2015-1252 Project Address: 810 9th AVE S. Scope: Plan Revisions to new SFR Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Sheet A7: 1. To provide a clear path of construction, please remove all items from the plans not utilized in the construction of the structure. For example, footings, stairwell, and window well. 2. The submitted foundation plan does not appear to include all the necessary isolated or strip footings to support the imposed loads from the upper floor. Please clarify and include the required quantity, size, and reinforcement on the plans. 3. The plans indicate the originally proposed basement was omitted and the area was filled in with structural fill, placed in 12” lifts. Please provide compaction reports from a certified third party inspection service or a memo on company letterhead that describes the material, placement process, and if the interior footings bare on native or compacted soils. Additional comments may be generated upon review of the additional information submitted. Please let me know if I can be of any further assistance. Sincerely, Eric Carter City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 Page 2 of 2