2015-1320 White (Wesco).pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 5, 2016 TO: Tony Shapiro A.D. Shapiro Architects tonys@adshapiro.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-1320 Project: White SFR Project Address: 8545 Talbot Road During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Note that the comnments from the original review appear below in italics. Original Non-structural: 1.Please clarify by what means the required energy credits from Table 406.2 of the 2012 Washington State Energy Code will be met. The information provided in your response must be added to the plans. 2.Clarify the method by which the whole house ventilation requirements will be met per the 2012 IRC section M1507. The information provided in your response must be added to the plans. 3.Please verify that all fixed and operable panels of swinging, sliding and bifold doors are equipped with safety glazing per IRC R308.4. OK 4.Door number D32 is shown along the north wall of the Jacuzzi room attached to the north end of the master suite. However, door D32 is unidentified on the door schedule. Please clarify. OK Original Structural: 5.Main Floor Plan a.The upper floor is comprised of two sub-diaphragms. It is clear how the two sub- diaphragms are transferring shear load on three sides and intermediately. However, please clarify the shear path of the lateral load generated by the upper floor diaphragm along the interior halves of the aforementioned sub-diaphragms. Please show how the new columns will effectively transfer lateral loads into the foundation. Provide details of the connections required above, below and at the mid- span diaphragm along the columns. b.It appears that the sub-diaphragms comprising the upper floor do not conform to the aspect ratios provided in the AF&PA SDPWS section 4.2.4. Please justify. OK c.Please provide calculations to show that the upper floor diaphragms are not overstressed without blocking. OK 6.Please provide framing layouts for the roof and floor framing from the manufacturer for each level of the structure with engineered lumber/trusses, as a deferred submittal. OK Additional Comments Sheet A1 7.Note on plans that stucco installation is to conform to IRC R703.6. Sheet A-3 8.Add a note ‘SEE SHEET A13 FOR WINDOW/DOOR SCHEDULES.’ 9.Provide detail bugs to reference the relevant foundation details to help guide proper review, construction and inspection. Sheet A-4 10.Note on the plans that the pool will be submitted under a separate permit. 11.Please specify on the plans the method to be used to fill and drain the Jacuzzi. While the pool can be applied for under a separate permit, the above considerations should be made for the pool as well. Page 2 of 4 12.Provide the details required for the HFX assembly specified at the garage doors. At minimum, please include the manufacturer’s typical detail sheet in the plans to help guide proper construction and inspection. 13.Add a note ‘SEE SHEET A13 FOR WINDOW/DOOR SCHEDULES.’ 14.Provide a note indicating where the shear wall schedule can be found. No shear wall schedule could be found during this review. Sheet A-5 15.Provide a detail with specifications or calculations for the guard rails above the open to below area per IRC Table R301.5. 16.Specify on the plans the method to be used to fill and drain the Jacuzzi off the Master Bedroom. 17.Add a note ‘SEE SHEET A13 FOR WINDOW/DOOR SCHEDULES.’ 18.Provide a note indicating where the shear wall schedule can be found. No shear wall schedule could be found during this review. Sheet A-6 19.It appears that the columns are called out by number, but it is unclear to what that number is referring. Please provide a column schedule correlating to the column call-outs or label each column appropriately. 20.Provide details and/or specifications for wood column to footing connections. 21.Provide details for steel column to footing connections. 22.Install detail bugs or at minimum a reference to the foundation detail sheet. Sheet A-7 23.Provide steel connections details for the various configurations to be utilized including steel to steel and steel to wood connections. 24.Provide steel column to top of stem wall connection details. 25.Specify each of the beam hangers required. Sheet A-8 26.Provide connection details for the new 21.5’ HSS6x6x3/8 column including top connection, mid-span floor connection and foundation connection details. 27.Clarify what the B/1 call-out is representing. It appears that it may be a detail, but no such detail could be found. Sheet A-9A 28.Provide a detail for locations where three beams interface at a single column such as where B63, B52 and B53 interface. 29.Studs over 12’ require a stud height check per IRC R301.3. Please provide calculations showing structural adequacy at those studs in excess of 12’ in height. 30.Per Item#27 above, it appears that a detail sheet may be missing from the submitted plan set as no details could be found to correlate with the call-outs on the plan. Please clarify. Page 3 of 4 31.Please provide a shear wall schedule and make reference to it on this sheet. Sheet A-10 32.Detail A refers to Page S-1, yet no S-1 could be found. Please clarify. 33.Detail C has a note “SEE PAGE FOR STEEL COLUMN CONNECTION”. Please clarify what is intended with this note. 34.Specify how the 1x6 nailers at the top and bottom of the steel beam will be connected to the flanges. Sheet A-11 35.Similar to Item#32 above, several references are made to Sheet S-1, yet no such sheet could be found. 36.Section 1B refers to R402.2.2.8. This is not a valid section from the 2012 IBC. Please clarify what this is referencing. 37.Each of the sections on this sheet refer to another place for concrete and reinforcing information. This information could not be found on the plans. Sheet A-12 38.Add a note to the plans that the swimming pool will be applied for under a separate permit or as a deferred submittal. Sheet A-13 39.For consistency and accuracy, please label ALL glazing that is required to be safety glass. General 40.The engineer has included several details including B/1, F/1, H/1, I/1 and a cantilevered foundation detail/schedule that do not appear on the plans. Please include these details and reference them in the appropriate locations. 41.Please include typical shear transfer details for connections at the roof, floor to floor and at the foundation to clarify the shear load path. 42.No general construction notes could be found in the plan set other than notes referring specifically to stairs. General notes are commonly desirable for job specific clarifications as well as typical notes. Please verify that it is the design team’s intention to exclude any sort of general notes. Page 4 of 4