Loading...
2015-1360 Dack addition-remodel - Fosmore.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 15, 2016 TO: Wally Fosmore wallyf@fosmoreconstruction.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1360 Project Address: 850 North Stream Lane Project: Dack addition-remodel Scope: Addition and remodel of single family residence – R-3/U occupancy groups – V-B construction – NFPA sprinkler system not required– mechanical and plumbing included disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. On the Residential Building Permit Application Form A: 1.Scope of Work – Clarify the difference in the indicated scope of work and of that represented on the provided architectural drawings. The submitted construction documents should consistently detail the proposed work. 2.Plumbing Fixture Count - Clarify the difference in the number of the following items listed and that of those represented on the provided architectural drawings. The amounts should consistently reflect the number to be added/altered and is required to properly determine the plumbing portion of the permit fees. a.Plumbing Fixture Count – Water Closet (Toilet) b.Plumbing Fixture Count – Sink c.Plumbing Fixture Count – Tub/Shower In the Environmentally Critical Areas Study & Buffer Mitigation Plan: 3.Project Description - Clarify the difference in the indicated scope of work and of that represented on the provided architectural drawings. General Notes: 4.Provide as part of a complete permit submittal an ‘Existing Floor Plan’ per the City of Edmonds ‘Residential Addition/Remodel/Alteration Permit Submittal Requirements’. It is difficult to assess the extent and effect of the proposed work without knowing the existing configuration of the structure. In addition to the indicated use of each of the spaces, it should include the locations of the interior/exterior walls and the openings in them. 5.Indicate on the plans the required energy credits to be selected per Washington State Energy Code (WSEC) R406. On sheet 2 – Floor Plan: 6.Floor Plan – Indicate on the plans the required carbon monoxide alarm outside of each sleeping area in the immediate vicinity of the bedrooms and on each level per International Residential Code (IRC) R315. On sheet 3 – Foundation Plan: 7.Foundation Plan – Clarify the difference in the indicated ‘built-up beam’ and of that specified on sheet 4 – Framing Plan – and on sheet 5 – Section View. On sheet 4 – Framing Plan: 8.Framing Plan a.Indicate on the plans the minimum required attachment of the (2)2x10 joist below the west exterior wall of the ‘Kitchen’ addition to the ‘built-up’ beam to guide proper review, installation, and inspection. b.Indicate on the plans the minimum required attachment to support the east end of the ‘built-up’ beam. c.Indicate on the plans the proposed construction required to mitigate the removal of the existing exterior walls supported by the foundation and transfer the lateral loads from the floor diaphragm of the addition to the foundation. On sheet 5 – Section View: 9.Section View a.Clarify the proposed ‘R-Value’ of the attic insulation. It does not appear to comply with that required per WSEC Table 402.1.1. b.Clarify the proposed ‘R-Value’ of the floor insulation. It does not appear to comply with that required per WSEC Table 402.1.1. Page 2 of 2