Loading...
2015-1491 Edmonds Fishing Pier repairs - BergerABAM.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 5, 2016 TO: City of Edmonds jim.stevens@edmondswa.gov FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1491 Project Address: 200 Admiral Way Project: Fishing Pier repairs approved Please be advised that the building plans for the above referenced project have been by the Building Division for the purposes of obtaining a building permit. During a review for compliance with the applicable building codes, it was found that the following information or clarifications were neededand have been added to the plans or permitted to be provided as a deferred submittal.Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. 1.A City of Edmonds ‘Special Inspection and Testing Agreement’ – see attached - for the following work must be completed and returned prior to permit issuance: Placement of high performance concrete repair material · Concrete reinforcement and galvanic anode replacement/repairs · Expansion/adhesive anchorage in concrete · Guard top rail replacement · 2.Electrical permits and inspections for additions and alterations of electrical systems and their components must be obtained from the Washington State Department of Labor & Industries. 3.Prior to installation of the replacement lighting fixtures, provide a completed Washington State Energy Code (WSEC) Commercial Provisions Compliance Form ‘Exterior Lighting Summary’ - LTG-EXT - to guide proper installation and inspection. 4.Provide the manufacturer’s installation requirements at the time of inspection for the attachment of the following structures to the pier deck: Kiosk Information Center · Benches · Windbreak Partition · Windbreak Enclosure ·