Loading...
2015-1527 Yglesias (Leren).pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 11, 2016 TO: Tom Leren The Leren Company tom@lerendesign.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-1527 Project: Yglesias Addition/Remodel Project Address: 17522 Talbot Road During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Sheet A3 1.Per the method of compliance with WSEC R402.6 listed on sheet A1, all floors shall be insulated to R-38. There are conflicting notes regarding insulation in Section 2/A3. Please remove the note regarding R-30 insulation. Sheet A5 2.Conflicting information can be found regarding the beam call-out between Section 5 and the Roof Framing Plan. The section view specifies a 3-1/2” x 5-1/2” PSL. The framing plan shows (2) 1-3/4” x 5-1/2” LVL. Please reconcile these two specifications with the engineering calculations which calls for (2) 1-3/4” x 5-1/2” PSL 2.0E. 3.The beam to beam connections above the Bathroom specifies ‘Hanger Per Engineer’, however no specification could be found. Please provide this specification on the plans. Also specify the hanger to be used from the existing beam to the new GLB. 4.Provide connection details for the top end of the new rafters to be installed above both areas where new rafters are to be installed.