Loading...
2015-1562 Edmonds Memory Care fire sprinkler - Fox Fire Prevention.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 5, 2016 TO: Fox Fire Prevention info@foxfireprevention FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1562 nd Project Address: 21006 72 Avenue W Project: Edmonds Memory Care fire sprinkler Scope: Install a NFPA-13 sprinkler system on first level – install a NFPA-13R sprinkler system in the remainder of the structure disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. General Review Note: 1.Provide as a part of a complete submittal, plans for the proposed sprinkler coverage in the attic areas over the third floor level required per NFPA-13R. On sheet 1 – General Notes and Legend, Site Plan, Section, Hydraulic Summary, Hanger Details nd 2.Hydraulic Summary – Clarify the incomplete entries for ‘Remote Area #5 – 2 Floor Residential. st On sheet 2 – 1 Floor Piping Plan, Earthquake Bracing Details and Calculation 3.Sprinkler Callout Legend – Provide on the plans a description for the sprinklers represented on the plans with a ‘diamond’ symbol in the ‘walk-in-cooler’ and ‘freezer’ – gridlines B.25/3-4. nd On sheet 3 – 2 Floor Piping Plan, CVPC Hanger Details, Piping Schedules nd 4.2 Floor Piping Plan – Clarify the lack of sprinkler coverage in each of the residential unit closets and in space ‘265’ – Mechanical. It does not appear to meet the requirements of NFPA-13R. On sheet 4 – 3rd Floor Piping Plan, CVPC Hanger Details, Riser Detail 5.3rd Floor Piping Plan – Clarify the lack of sprinkler coverage in each of the residential unit closets. It does not appear to meet the requirements of NFPA-13R. Page 2 of 2