PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: January 5, 2016
TO: Fox Fire Prevention
info@foxfireprevention
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-1562
nd
Project Address: 21006 72 Avenue W
Project: Edmonds Memory Care fire sprinkler
Scope: Install a NFPA-13 sprinkler system on first level install a NFPA-13R
sprinkler system in the remainder of the structure
disapproved
Please be advised that the building plans for the above referenced project have been
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
.
information, clarifications, or changes are neededReviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter.
A complete review cannot be performed until the revised plans/documents, including a
written response indicating where the clouded or otherwise highlighted changes can be
found on the revised plans, have been submitted to a Permit Coordinator.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City
Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed
on Wednesdays.
General Review Note:
1.Provide as a part of a complete submittal, plans for the proposed sprinkler coverage in the
attic areas over the third floor level required per NFPA-13R.
On sheet 1 General Notes and Legend, Site Plan, Section, Hydraulic Summary, Hanger Details
nd
2.Hydraulic Summary Clarify the incomplete entries for Remote Area #5 2 Floor
Residential.
st
On sheet 2 1 Floor Piping Plan, Earthquake Bracing Details and Calculation
3.Sprinkler Callout Legend Provide on the plans a description for the sprinklers represented
on the plans with a diamond symbol in the walk-in-cooler and freezer gridlines
B.25/3-4.
nd
On sheet 3 2 Floor Piping Plan, CVPC Hanger Details, Piping Schedules
nd
4.2 Floor Piping Plan Clarify the lack of sprinkler coverage in each of the residential unit
closets and in space 265 Mechanical. It does not appear to meet the requirements of
NFPA-13R.
On sheet 4 3rd Floor Piping Plan, CVPC Hanger Details, Riser Detail
5.3rd Floor Piping Plan Clarify the lack of sprinkler coverage in each of the residential unit
closets. It does not appear to meet the requirements of NFPA-13R.