Loading...
2015-1620 Select Homes SFR - Nash.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 4, 2016 TO: Select Homes, Inc. kayla.clark@outlook.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-1620 th Project Address: 917 9 Avenue N Project: Select Homes SFR Scope: Construct single family residence – R-3/U occupancy group – V-B construction - NFPA-13D sprinkler system required– mechanical and plumbing included disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. On sheet A6: 1.Upper Floor Plan a.Provide on the plans a detail, and a reference to it, for the required construction of the floor trusses to facilitate the installation of the specified holdowns along shear wall lines ‘A’ and ‘C’. b.Clarify the callout for the ‘T-2’ holdowns – MST48 – to tie each end of the ‘P1-6’ shear wall along the north wall of the ‘Master Bedroom’ to the beam below.