2016-0087 First Financial Bank mechanical - Right On.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 3, 2016 TO: Right On Heating & Sheet Metal, Inc. rightonheating@frontier.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2016-0087 Project Address: 184 Sunset Avenue S Project: First Financial Bank mechanical Scope: Install gas piping, rooftop unit, bathroom exhaust fans, and ductwork – B occupancy group – V-B construction – existing NFPA-13 sprinkler system disapproved Please be advised that the building plans for the above referenced project have been for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following . information, clarifications, or changes are neededReviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. General Review Notes: 1.Provide on the plans a detail, designed and ‘stamped’ by an engineer, for the required support and attachment of the rooftop unit per page 9 of the provided mechanical equipment submittal data, IMC 301.15/18, IBC 1609/1613, and ASCE 7-10 chapter 13. 2.Provide on the plans information regarding the proposed required equipment access per International Mechanical Code (IMC) 306.5. Details should include the access hatch and its location, the distance above grade to access the equipment, and the equipment access ladder (or other means to be used) and its location. On sheet A0.2 – Building Plan & Egress Plan: 3.Egress Plan a.Clarify the difference in the represented room layout and of that depicted on the plans for tenant improvement work to be completed under permit BLD2015-1325. Changes in the locations and uses of the spaces have been approved on revised plans for the tenant improvement that do not appear on the plans for the work proposed under this submittal. The plans for the proposed work, along with other associated work to be completed as part of the tenant improvement, should be consistently represented to guide proper review, installation, and inspection. b.Indicate on the plans the minimum required exhaust airflow rate (CFM/sq. ft.) for the ‘Break Room’ per International Mechanical Code (IMC) Table 403.3. c.Indicate on the plans the means to be used to discharge any excess supply air in the ‘Break Room’ per the pressure equalization requirements of IMC 501.4. d.Clarify the indicated locations of the proposed return air openings. When closed, the doors in the openings between the individual spaces and the return air openings do not allow an approximately equal amount of supply air and return or exhaust air per IMC 403.1. Return air ducts or transfer openings into each of the spaces are typically installed to meet this requirement. Page 2 of 2