Loading...
PLAN R CORR Feng Lin.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: April 12, 2016 TO: Ted L. Clifton ted@zero-energyplans.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2016-0121 Project: Alex Feng Lin New SFR th Project Address: 24025 74 Avenue W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Comments 1.A comprehensive geotechnical report, in compliance with section 1803 of the 2012 International Building Code, shall be provided for the above-referenced property. 2.Please be aware that a survey will need to be submitted to verify the location of the structure on the above-referenced property in relation to the property lines. The survey should also include the location of the wetlands buffer and the base flood elevation, 286.14’. 3.Please complete the special inspection form attached and return it to a permit coordinator upon resubmittal of the plans. Sheet 1 4.It appears that window @ W-18W is required to have safety glazing per IRC R308.4. Please verify. Update the window schedule as required as well. 5.Add a note that all glazing in doors is to be safety glazing. Sheet 2 6.Clarify how the toilet/wash basin combo unit satisfies the space 21” space requirement at sinks, as set forth in IRC R307.1. Additionally, verify that the headroom requirements from IRC R305.1 are satisfied. Sheet 4 7.Detail 4 shows the roof pitch to be 4/12, typical. However, no 4/12 pitch could be found in the roof layout below. Please reconcile. 8.Please provide a detail for the connection between beams 32B and 31B. While the notes on Sheet 8 describe the connection, a drawing will help to guide an accurate and efficient inspection. 9.Similar to item 17, please provide a detail for the connections between beam 33B and beams 31B and 34B. Also provide a detail for the connection between beam 32B and 34B. 10.The plans show a post below the connection between beams 31B and 33B. However, the calculation sheet C12 shows that end of beam 33B as cantilevered. In addition, no point load from the aforementioned post appears on the calculation sheet C19 for beam 56B below. Please review the calculations and update the drawings as needed. 11.Make a note on Sheet 4: ‘See Sht.7 for engineering key plans and Shts.8 and 9 for framing and structural notes.’ 12.Please transfer each of the engineer’s header and post specifications to the roof framing plan from the framing notes as was done with the steel beam specifications. 13.Please specify the hangers to be used to hang the floor joists from the steel beams rather than calling for ‘top flange style’ hangers. Sheet 8 14.Provide a detail showing how the 2x nailers will be connected to the steel beams. 15.As mentioned above, details should be provided for the steel beam connections listed in items 17 and 18. Sheet 14 16.It appears that the intention was to show the Base Flood Elevation (BFE) where a topo line is shown at 286.4’. The BFE for this area is actually 286.14’. Please revise the site plan and label the corrected top line ‘BFE’. Page 2 of 2