Loading...
20160127150037.pdfDATE: Citv of Edmonds E J 2' 21116' PLAN REVIEW COMMENTS rJ"m"To 1N January 11, 2016 BUILDING DIVISION (425)771-0220 1/23/16 .... I e pon e to cornet nt1 in red Ib6lo , TO: Tom Leren The Leren Company tom(nlerendes i .coNm FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-1527 Project: Yglesias Addition/Remodel Project Address: 17522 Talbot Road During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Sheet A3 Per the method of compliance with WSEC R402.6 listed on sheet Al, all floors shall be insulated to R-38. There are conflicting notes regarding insulation in Section 2/A3. Please remove the note regarding R-30 insulation. Note at detauu 2.-A3 regarding R� 30 has been chnann0ed to R-38. Sheet A5 2. Conflicting information can be found regarding the beam call -out between Section 5 and the Roof Framing Plan. The section view specifies a 3-1/2" x 5-1/2" PSL. The framing plan shows (2) 1-3/4" x 5-1/2" LVL. Please reconcile these two specifications with the engineering calculations which calls for '(2) 1-3/4" x 5-1/2" PSL 2.OE. 3. The beam to beam connections above the Bathroom specifies `Hanger Per Engineer', however no specification could be found. Please provide this specification on the plans. Also specify the hanger to be used from the existing beam to the new GLB. 4. Provide connection details for the top end of the new rafters to be installed above both areas where new rafters are to be installed. hDetaR 6-A5 Inas been added to plan. Also h..N2,5A°s at each matter have been gadded at wall coonecdon. 2. "'ll-Ine connect bear n lis (2) 't...0/4"x .. 1/2''' R....V1..... See revised callcUlationns. 3. II....panu0en has been added on plan. �lri addition, the South 0 feet of the new bedroonn°n addition Inas lbeen removed due to a setback concern from planning. rhe new vvallll is now nnonn­deaniinng and slits n.urden and )Mthn n the exii,stlin0 iroof II'inoe. T'he shoed fear nunn0 above thne garage was eliinanl noted from the pan.