Loading...
20160129154032.pdfr4 ARCHITECTSMARKPARKER January 26, 2016 City of Edmonds Development Services Department Building Division 121 5t" Ave North Edmonds WA 98020 Re: Plan check BLD2015-1539 8304 184" St SW Joseph, In response to plan review comments for project BLD2015-1539, we have made the following revision; Bt�� "l1 1. Sheet A1,Energy Notes; Note #11 has been modified to reflect WSEC R101.4.3 2. Sheet A2, Floor plan; a. Section callout has been revised. b. Section callout has been revised. c. Residential building Permit Application form; Plumbing fixture count has been revised to reflect relocated hose bib. 3. Roof Framing Plan; a. New and existing cross beams have been revised as noted. Structural calculations for these beams are attached. b. Portal frame has been added along north wall. 4. Detail 3/A3; Detail has been revised from #3 bar to #4 bar. IM)ineerirrg, Site plan has been revised to reflect potential side sewer in location of construction. Please contact us with any further questions or comments. Sincerely, Mark Parker Mark Parker Architects PLLC 1115 North 401hStreet Seattle, WA 98103 (206)547-7933 a,rkParkerArchitects.com