Loading...
2016-0130 Graves.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 18, 2016 TO: Brian Bate Tend Home Services brianbate@msn.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2016-0130 Project: Graves Addition Project Address: 8028 Cyrus Place During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Comments 1.A separate fire sprinkler modification permit will be required for this project. Please review the information available online regarding Handout B32 here: http://www.edmondswa.gov/images/COE/Services/Permits_and_Development/Forms_and_ Handouts/B32-FIRE_ALARM-SPRINKLER.pdf 2.Please indicate on the plans the path of compliance to the Washington State Energy Code (WSEC) regarding the energy credits required for an addition per Table 406.2. 3.Verify that the required smoke alarms meet the current code. They should be properly placed, hard-wired and interconnected per IRC R314. 4.Please identify which window within the master bedroom provides emergency egress per IRC 310. 5.The plans, as submitted, are incomplete. Please provide the following to help guide proper review, construction and inspection: a.Roof framing plan to include dimensions, beam/header specifications and applicable details/sections as provided in the engineering packet. The note ‘See engineering packet’ does not lend itself to efficient inspection procedures, and is not allowable. nd b.Similarly, provide a 2 floor framing plan to include dimensions, beam/header/joist specifications and applicable details/sections as provided in the engineering packet. c.Foundation plan to include dimensions and applicable details/sections as provided in the engineering packet. d.Structural Notes. e.Lateral specifications including shear walls and holdowns, shear wall schedule and all applicable details. (end of list)