Loading...
20160301103339.pdfNFI ,ice S wmu. B RESPONSES TO THE PLAN REVIEW COMMENT � ITY n E-MM09 Project #BLD 2015-0799 10/30/2015, 2/8/2016 Leif Bjorback City of Edmonds Re: Project #BLD2015-0799 Project name: FR "-rER HOUSE ADDITION Address: 7731 234TH ST SW Dear Mr. Leif Bjorback: The following are our responses to your plan review comment on your email of Augustl3, 2015. All revision made on plan are clouded. #1. Whole house ventilation. Existing house built on 1984 without whole house ventilation system. Since the new addition is separated with existing building exterior structural wall, we added (2) exhaust fan to interlock with existing house furnace return air system by adding fresh air duct connect to close by exterior wall weather protected fresh air intake opening. Please review on sheet A02 floor plan and note of clouded area. #2. Smoke alarm: Added on revised plan. See sheet A02 floor plan clouded area. #3. Hard wired carbon monoxides detector/alarm. Added, see plan sheet A02, floor plan, clouded area. #4. 3'x3' Landing on garage side door. Showed on plan. sheet A02 floor plan. #5. Crawl space ventilation. Class -I vapor retarder shown on plan sheet A08, typ. detail P. Please review the revised notes and calculation on sheet A04. Provided (4) standard 8x16 foundation vent, net vent area is 2.8 sf, more than required 2.1 sf. #6. Structural general note of referenced code as IBC 2003. Revised to reference as IRC 2012. Sheet A05. My overlook. #7 & #8, New hobby room north and east shear wall. Actually, there is no need to using those two walls as shear wall. The side force can be transferred through roof diaphragm to all other shear wall. My purpose is only to have those two walls stronger. Sine it is not comply with code as shear wall, I removed the mark on plan to not use those two walls as shear wall. #9. Wall panels at the front of the garage. Thank you for point out and instructions. Revised plan to use Portal Frame Method on each side of garage door opening. Typ. detail provide on plan sheet A07 -R according to proposed garage door opening and foundation plan. Please refer to section L, and H for all related details dimensions. All hardware for portal frame wall is use Simpson hardware for easier for contractor to purchase. Should you have any questions and concern, please email or call me at any time. To speed up the review process, we authorize you to "red mark" on our plan and calculations if you find any minor mistake or typo. Sincerely yours, David Lee 206-817-6081 (cell) david608l ggmail.com